Technology Category
- Analytics & Modeling - Digital Twin / Simulation
- Sensors - Temperature Sensors
Applicable Industries
- Cement
- Construction & Infrastructure
Applicable Functions
- Facility Management
- Product Research & Development
Use Cases
- Construction Management
- Digital Twin
Services
- System Integration
- Testing & Certification
About The Customer
PT. Wijaya Karya (WIKA) is a state-owned enterprise in Indonesia that operates in the construction industry. The company is involved in various construction projects, including infrastructure, building, and industrial plant projects. WIKA is known for its innovative approach to construction, including the use of modular construction methods and digital technologies. In response to the COVID-19 pandemic, WIKA was tasked by the Indonesian government to construct a state-of-the-art healthcare facility in South Jakarta. The company was required to complete the design and construction of the hospital and have it fully operational in less than a month, a challenge that required innovative solutions and efficient project management.
The Challenge
Indonesia, like many countries, faced a surge in COVID-19 cases that exceeded the capacity of existing healthcare facilities. To address this, the Indonesian government initiated plans to construct 14 new hospitals. PT. Wijaya Karya (WIKA) was tasked with building one of these hospitals on a 22,700-square-meter former soccer field in South Jakarta. The USD 4 million hospital was to be a one-story building with a capacity of 300 beds, 35 intensive care unit rooms, and 10 emergency rooms. The hospital was to be equipped with a negative pressure isolation system to prevent the spread of the virus, a robotic nurse, and an integrated command center to connect it to 65 other hospitals. The government required WIKA to complete the design and construction of the hospital and have it fully operational in less than a month. The project also needed to be cost-effective and environmentally sustainable. WIKA faced the challenge of meeting these requirements on an incredibly tight timeline, compounded by social distancing requirements.
The Solution
WIKA integrated their modular construction standards with digital BIM application to meet the project's requirements. They established a connected data environment using ProjectWise and adopted Bentley’s reality modeling and BIM methodology to carry out their modular approach. They used a quadcopter drone and ContextCapture to capture and process images of the project site, creating a reality model of the topographic area. With OpenBuildings Designer, they generated a model of the entire hospital building, including structural, architectural, and MEP elements. They also incorporated landscape and roadway design with OpenRoads. To optimize the design of the indoor airflow system, WIKA used Hevacomp1 to perform airflow analysis and simulation within the building model. They integrated the 3D models with the construction schedule and costs using SYNCHRO 4D while using LumenRT for visual animation. This integrated digital modeling solution allowed design and construction to occur simultaneously, identifying and resolving design clashes, and making virtual changes to avoid errors and costly rework on site.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Splunk Partnership Ties Together Big Data & IoT Services
Splunk was faced with the need to meet emerging customer demands for interfacing IoT projects to its suite of services. The company required an IoT partner that would be able to easily and quickly integrate with its Splunk Enterprise platform, rather than allocating development resources and time to building out an IoT interface and application platform.
Case Study
Bridge monitoring in Hamburg Port
Kattwyk Bridge is used for both rail and road transport, and it has played an important role in the Port of Hamburg since 1973. However, the increasing pressure from traffic requires a monitoring solution. The goal of the project is to assess in real-time the bridge's status and dynamic responses to traffic and lift processes.
Case Study
Bellas Landscaping
Leading landscaping firm serving central Illinois streamlines operations with Samsara’s real-time fleet tracking solution: • 30+ vehicle fleet includes International Terrastar dump trucks and flatbeds, medium- and light-duty pickups from Ford and Chevrolet. Winter fleet includes of snow plows and salters.