About The Customer
ASGC is a leading construction services and manufacturing facilities provider based in the United Arab Emirates. Established in 1989, the organization comprises several companies, each a market leader in its own sphere of expertise. ASGC is best known for delivering turnkey projects in the UAE and has been involved in landmark projects across diverse sectors, including residential, commercial, leisure, hospitality, healthcare, education, social infrastructure, and industrial. For the Coca-Cola Arena project, ASGC was tasked with providing 4D construction planning and scheduling, managing the complex workflows and steps involved in constructing the state-of-the-art multipurpose arena.
The Challenge
ASGC, a leading construction services and manufacturing facilities provider, was tasked with constructing the Coca-Cola Arena, a state-of-the-art multipurpose arena in Dubai. The arena, spanning half a million square feet with a capacity of 20,000 people, was to be the only all-purpose indoor and air-conditioned arena of its size in the region. The project required meticulous planning and scheduling to manage the many steps and workflows involved. The arena was designed to accommodate large-scale international music concerts, sporting events, and other entertainment events, and was to feature an advanced infrastructure, including four levels of seating and hospitality suites. The project also required the construction of an adaptable layout that could be changed depending on the scale of the event. The challenge was to manage the complex construction process efficiently, ensuring timely completion while maintaining high standards of quality and safety.
The Solution
ASGC chose SYNCHRO Pro as the platform for preparing the 4D construction planning and scheduling. The software provided a comprehensive construction simulation and was used as a planning application for the project. The project team created a visual representation of the construction schedule, which facilitated communication among all project stakeholders. The representation also helped streamline decision-making during weekly, monthly, and quarterly meetings. ASGC generated reports of the site progress, comparing the actual vs. planned schedule and approved baseline. Before construction began, ASGC created a 3D BIM model of the project to visually detect clashes and review them alongside the schedule progress. The model provided construction simulations of scenarios and comparisons, which could be done before any work on the construction site. ASGC also used SYNCHRO Pro’s 4D construction planning and scheduling during construction to improve communication and performance.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Splunk Partnership Ties Together Big Data & IoT Services
Splunk was faced with the need to meet emerging customer demands for interfacing IoT projects to its suite of services. The company required an IoT partner that would be able to easily and quickly integrate with its Splunk Enterprise platform, rather than allocating development resources and time to building out an IoT interface and application platform.
Case Study
Bridge monitoring in Hamburg Port
Kattwyk Bridge is used for both rail and road transport, and it has played an important role in the Port of Hamburg since 1973. However, the increasing pressure from traffic requires a monitoring solution. The goal of the project is to assess in real-time the bridge's status and dynamic responses to traffic and lift processes.
Case Study
Bellas Landscaping
Leading landscaping firm serving central Illinois streamlines operations with Samsara’s real-time fleet tracking solution: • 30+ vehicle fleet includes International Terrastar dump trucks and flatbeds, medium- and light-duty pickups from Ford and Chevrolet. Winter fleet includes of snow plows and salters.