Technology Category
- Application Infrastructure & Middleware - Data Exchange & Integration
- Application Infrastructure & Middleware - Middleware, SDKs & Libraries
Applicable Industries
- Aerospace
- Cement
Applicable Functions
- Product Research & Development
Use Cases
- Construction Management
- Inventory Management
Services
- Cloud Planning, Design & Implementation Services
- System Integration
About The Customer
Atkins is a multinational engineering, design, planning, project management, and consulting services company based in London, UK. As part of the SNC-Lavalin Group, Atkins is one of the world’s most respected design, engineering, and project management consultancies, offering services ranging from civil and construction to aerospace. In 2016, Atkins was the UK’s largest engineering consultancy and the world’s 11th largest design firm. It employed approximately 18,000 people in 300 offices across 29 countries, with projects in over 150 countries. Atkins is also a leading international provider of geotechnical consultancy services with a geotechnical team of more than 300 professionals. The company has an impressive portfolio of prestigious and diverse geotechnical projects worldwide across its three geotechnical divisions: tunneling and underground space, energy geotechnics and specialist services, and infrastructure geotechnics.
The Challenge
Atkins, a multinational engineering and consulting services company, faced a significant challenge in managing geotechnical data across its diverse projects. The geotechnical team at Atkins used multiple technologies and applications that needed to work in harmony. The company needed to provide timely, detailed, and engaging analysis and deliverables to its clients, making geotechnical technology and data integration, as well as proper project workflows, crucial for efficiency and quality of service. To assess ground conditions, Atkins used Bentley’s OpenGround Cloud and established a detailed geographic information system using QGIS or ArcGIS. However, the process of manually exporting the geotechnical project data from OpenGround Cloud and importing it into QGIS or ArcGIS in the form of multiple CSV files was time-consuming and prone to errors.
The Solution
To address these challenges, Atkins turned to Bentley’s OpenGround Cloud technology, which the geotechnical team had previously used for querying data at various scales. The team specified a project in the cloud that is automatically linked via the API and ingested into an existing GIS system. Users could then log in within QGIS or ArcGIS to perform GIS analysis of the geotechnical project data. This data could be robustly queried, assessed, and enriched collaboratively across multiple practices with existing GIS processes and services. Integration with other Bentley geotechnical BIM technologies like PLAXIS® allowed for similarly integrated connections via the PLAXIS API to automatically import borehole data ahead of numerical analysis. Data could also be written to the OpenGround Cloud where applicable.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Airbus Soars with Wearable Technology
Building an Airbus aircraft involves complex manufacturing processes consisting of thousands of moving parts. Speed and accuracy are critical to business and competitive advantage. Improvements in both would have high impact on Airbus’ bottom line. Airbus wanted to help operators reduce the complexity of assembling cabin seats and decrease the time required to complete this task.
Case Study
Aircraft Predictive Maintenance and Workflow Optimization
First, aircraft manufacturer have trouble monitoring the health of aircraft systems with health prognostics and deliver predictive maintenance insights. Second, aircraft manufacturer wants a solution that can provide an in-context advisory and align job assignments to match technician experience and expertise.
Case Study
Aerospace & Defense Case Study Airbus
For the development of its new wide-body aircraft, Airbus needed to ensure quality and consistency across all internal and external stakeholders. Airbus had many challenges including a very aggressive development schedule and the need to ramp up production quickly to satisfy their delivery commitments. The lack of communication extended design time and introduced errors that drove up costs.
Case Study
Accelerate Production for Spirit AeroSystems
The manufacture and assembly of massive fuselage assemblies and other large structures generates a river of data. In fact, the bill of materials for a single fuselage alone can be millions of rows of data. In-house production processes and testing, as well as other manufacturers and customers created data flows that overwhelmed previous processes and information systems. Spirit’s customer base had grown substantially since their 2005 divestiture from Boeing, resulting in a $41 billion backlog of orders to fill. To address this backlog, meet increased customer demands and minimize additional capital investment, the company needed a way to improve throughput in the existing operational footprint. Spirit had a requirement from customers to increase fuselage production by 30%. To accomplish this goal, Spirit needed real-time information on its value chain and workflow. However, the two terabytes of data being pulled from their SAP ECC was unmanageable and overloaded their business warehouse. It had become time-consuming and difficult to pull aggregate data, disaggregate it for the needed information and then reassemble to create a report. During the 6-8 hours it took to build a report, another work shift (they run three per day) would have already taken place, thus the report content was out-of-date before it was ever delivered. As a result, supervisors often had to rely on manual efforts to provide charts, reports and analysis.