Customer Company Size
Large Corporate
Region
- America
Country
- United States
Product
- GENESIS32™
- TrendWorX™32
- ReportWorX™32
- AlarmWorX™32
Tech Stack
- OPC interfaces
- Radio telemetry system
Implementation Scale
- Enterprise-wide Deployment
Impact Metrics
- Productivity Improvements
- Environmental Impact Reduction
Technology Category
- Platform as a Service (PaaS) - Connectivity Platforms
Applicable Industries
- Utilities
- Cities & Municipalities
Applicable Functions
- Facility Management
- Logistics & Transportation
Use Cases
- Water Utility Management
- Infrastructure Inspection
Services
- System Integration
- Software Design & Engineering Services
About The Customer
The city of Lubbock is located in the Texas panhandle, an area known for its arid conditions. The city is often referred to as the 'hub of the plains' due to its flatlands and drought-prone environment. As such, responsible water use is a critical concern for the city. The Lubbock Water Utilities Department is tasked with managing all aspects of the city's water needs. This includes water collection, water and wastewater treatment. The department must draw water from multiple sources to meet the demands of the city's growing population. Primary sources include Lake Meredith and groundwater from aquifers. In times of peak demand, the supply is supplemented by well-fields operated by the Canadian River Water Authority.
The Challenge
The city of Lubbock, located in the arid Texas panhandle, faces significant challenges in managing its water resources. With a growing population, the city must draw water from multiple sources, including Lake Meredith, groundwater from aquifers, and well-fields operated by the Canadian River Water Authority. The Lubbock Water Utilities Department is responsible for managing all aspects of the city's water needs, including water collection, water and wastewater treatment. The department needed a solution that would allow it to efficiently monitor and control all aspects of its water treatment plant, wastewater treatment plant, and well-field. The solution needed to provide real-time data on critical process variables, including chlorine, turbidity, suspended solids, and oxidation-reduction potential (ORP).
The Solution
The Lubbock Water Utilities Department implemented a new water and wastewater software solution from ICONICS, installed by Wunderlich-Malec. The GENESIS32™ system provides for the monitoring and control of all aspects of Lubbock’s water treatment plant, wastewater treatment plant, and well-field. Each of these locations has its own control room with several operator stations running on WebHMI. Through custom console panels designed by Wunderlich-Malec, operators use ICONICS to monitor values and controls. Data from the water distribution system is acquired over a radio telemetry system. ICONICS also provides Lubbock Water Utilities with trending, reporting, and alarming capabilities. This allows plant operators to respond to and identify critical problems as they arise, saving time and money. Trending and reporting offer efficient data analysis.
Operational Impact
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.

Case Study
Turning A Stadium Into A Smart Building
Honeywell created what it called the “intelligent system” for the National Stadium in Beijing, China, turning the venue for the opening and closing events at the 2008 Summer Olympics into a “smart building.” Designed by highly controversial artist Ai Weiwei, the “Bird’s Nest” remains one of the most impressive feats of stadium architecture in the world. The 250,000 square meter structure housed more than 100,000 athletes and spectators at a time. To accommodate such capacity, China turned to Honeywell’s EBI Integrated Building Management System to create an integrated “intelligent system” for improved building security, safety and energy efficiency.

Case Study
IoT Solutions for Smart City | Internet of Things Case Study
There were several challenges faced: It is challenging to build an appliance that can withstand a wide range of voltage fluctuations from as low at 90v to as high as 320v. Since the device would be installed in remote locations, its resilience was of paramount importance. The device would have to deal with poor network coverage and have the ability to store and re-transmit data if networks were not available, which is often the case in rural India. The device could store up to 30 days of data.

Case Study
Automation of the Oguz-Gabala-Baku water pipeline, Azerbaijan
The Oguz-Gabala-Baku water pipeline project dates back to plans from the 1970’s. Baku’s growth was historically driven by the booming oil industry and required the import of drinking water from outside of the city. Before the construction of the pipeline, some 60 percent of the city’s households received water for only a few hours daily. After completion of the project, 75 percent of the two million Baku residents are now served around the clock with potable water, based on World Health Organization (WHO) standards. The 262-kilometer pipeline requires no pumping station, but uses the altitude differences between the Caucasian mountains and the capital to supply 432,000 m³/d to the Ceyranbatan water reservoir. To the people of Baku, the pipeline is “the most important project not only in 2010, but of the last 20 years.”

Case Study
GPRS Mobile Network for Smart Metering
Around the world, the electricity supply industry is turning to ‘smart’ meters to lower costs, reduce emissions and improve the management of customer supplies. Smart meters collect detailed consumption information and using this feedback consumers can better understand their energy usage which in turn enables them to modify their consumption to save money and help to cut carbon emissions. A smart meter can be defined in many ways, but generally includes an element of two-way communication between the household meter and the utility provider to efficiently collect detailed energy usage data. Some implementations include consumer feedback beyond the energy bill to include online web data, SMS text messages or an information display in consumers’ premises. Providing a cost-effective, reliable communications mechanism is one of the most challenging aspects of a smart meter implementation. In New Zealand, the utilities have embraced smart metering and designed cost effective ways for it to be implemented. The New Zealand government has encouraged such a move to smart metering by ensuring the energy legislation is consistent with the delivery of benefits to the consumer while allowing innovation in this area. On the ground, AMS is a leader in the deployment of smart metering and associated services. Several of New Zealand’s energy retailers were looking for smart metering services for their residential and small business customers which will eventually account for over 500,000 meters when the multi-year national deployment program is concluded. To respond to these requirements, AMS needed to put together a solution that included data communications between each meter and the central data collection point and the solution proposed by Vodafone satisfied that requirement.
.png)
Case Study
Smart Street Light Network (Copenhagen)
Key stakeholders are taking a comprehensive approach to rethinking smart city innovation. City leaders have collaborated through partnerships involving government, research institutions and solution providers. The Copenhagen Solutions Lab is one of the leading organizations at the forefront of this movement. By bringing together manufacturers with municipal buyers, the Copenhagen Solutions Lab has catalyzed the development and deployment of next-generation smart city innovations. Copenhagen is leveraging this unique approach to accelerate the implementation of smart city solutions. One of the primary focus areas is LED street lighting.

Case Study
NB-IoT connected smart meters to improve gas metering in Shenzhen
Shenzhen Gas has a large fleet of existing gas meters, which are installed in a variety of hard to reach locations, such as indoors and underground, meaning that existing communications networks have struggled to maintain connectivity with all meters. The meter success rate is low, data transmissions are so far unstable and power consumption is too high. Against this background, Shenzhen Gas, China Telecom, Huawei, and Goldcard have jointly trialed NB-IoT gas meters to try and solve some of the challenges that the industry faces with today’s smart gas meters.