Technology Category
- Functional Applications - Enterprise Asset Management Systems (EAM)
- Sensors - Temperature Sensors
Applicable Industries
- Cement
- Construction & Infrastructure
Applicable Functions
- Maintenance
- Product Research & Development
Use Cases
- Construction Management
- Construction Site Monitoring
Services
- Testing & Certification
About The Customer
LLC Volgogradnefteproekt is a leading independent design firm serving the oil and gas industry in southern Russia. The company was retained to deliver an as-built 3D digital model for the seven platforms commissioned for the Vladimir Filanovsky offshore field in the Caspian Sea. The Vladimir Filanovsky field is located about 50 kilometers off the northern shore of the Caspian Sea at depths of 7 to 11 meters. LUKOIL discovered the multi-reservoir field in 2005 and put the first stage of development into operation in 2016. As one of Russia’s largest offshore fields, the oil-gas-condensate reservoirs hold 153.1 million tons of oil reserves and 32.2 billion cubic meters of gas reserves.
The Challenge
LLC Volgogradnefteproekt, a leading independent design firm serving the oil and gas industry in southern Russia, was tasked with delivering an as-built 3D digital model for the seven platforms commissioned for the Vladimir Filanovsky offshore field in the Caspian Sea. The project involved the construction of seven complex facilities, designed by six different companies. The client needed a process for managing engineering and technical information at all stages of the project, from verifying that the technical designs met project requirements, through planning construction schedules, and managing the logistics of materials and equipment delivery. With multiple contractors and subcontractors participating in the project, the client also needed to produce high-quality construction documents and monitor as-built work against the plan. The project was further complicated by a tight deadline imposed by the client and regulated by the government of the Russian Federation.
The Solution
Volgogradnefteproekt implemented Bentley’s AssetWise platform to create a connected data environment that would support asset lifecycle information management and provide a single source for project and asset information from six different companies involved in designing the oil field infrastructure. The project team created a single source of data that provided information mobility for the client’s multioffice design team. The team used Bentley design applications for the unit-conductor and exchanged data seamlessly using AECOsim Building Designer, Bentley Raceway and Cable Management, OpenPlant Modeler, ProSteel, Promis.e, and other Bentley applications. The software provided access to Russian databases of equipment, codes, and standards, helping designers meet the Russian government’s technical standards. The connected data environment allowed team members to exchange information and collaborate effectively with access to a central source of trusted data, regardless of their location.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Splunk Partnership Ties Together Big Data & IoT Services
Splunk was faced with the need to meet emerging customer demands for interfacing IoT projects to its suite of services. The company required an IoT partner that would be able to easily and quickly integrate with its Splunk Enterprise platform, rather than allocating development resources and time to building out an IoT interface and application platform.
Case Study
Bridge monitoring in Hamburg Port
Kattwyk Bridge is used for both rail and road transport, and it has played an important role in the Port of Hamburg since 1973. However, the increasing pressure from traffic requires a monitoring solution. The goal of the project is to assess in real-time the bridge's status and dynamic responses to traffic and lift processes.
Case Study
Bellas Landscaping
Leading landscaping firm serving central Illinois streamlines operations with Samsara’s real-time fleet tracking solution: • 30+ vehicle fleet includes International Terrastar dump trucks and flatbeds, medium- and light-duty pickups from Ford and Chevrolet. Winter fleet includes of snow plows and salters.