About The Customer
Architectural Craftsmen is a remodeling company based in Kansas City, Missouri. The company was founded by Joe Thompson, a veteran of the building industry, and later joined by his wife, Mary. Over the last 20 years, the company has grown to eight full-time employees. Despite their rich history in the industry, the Thompsons are looking forward to an eventual business exit or handoff in the future. They are constantly seeking ways to improve their business operations and prepare the company for a future sale. Their favorite tool for managing their business operations is CoConstruct, which they use to streamline their processes and increase efficiency.
The Challenge
Architectural Craftsmen, a remodeling company based in Kansas City, Missouri, was facing operational inefficiencies due to the lack of integration in their business processes. The company, led by Joe and Mary Thompson, had been using Excel and Word for their proposals, which did not allow for a seamless flow of information. This disjointed approach was causing difficulties in tracking project progress, especially when dealing with change orders and client preferences. The company was also holding weekly team meetings, which were becoming redundant as they were merely used for progress updates. The Thompsons were looking for a solution that could streamline their operations and prepare the company for a future sale or handoff.
The Solution
The Thompsons decided to integrate their business operations under one platform, CoConstruct. This construction project management platform allowed project schedules to connect with project financing, enabling Mary to monitor cash flow through projects in real-time. The company started using CoConstruct in various aspects of their business, seeing its potential impact on a future sale. Mary adopted the mantra, 'If it’s not in CoConstruct, it didn’t happen,' ensuring that all project details were recorded in the platform. This provided transparency and allowed for the documentation of historical information that could be referred back to. The use of CoConstruct also led to the elimination of the weekly team meeting, as progress updates were created in real-time on the platform, making the meetings redundant.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.

Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.

Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.

Case Study
Splunk Partnership Ties Together Big Data & IoT Services
Splunk was faced with the need to meet emerging customer demands for interfacing IoT projects to its suite of services. The company required an IoT partner that would be able to easily and quickly integrate with its Splunk Enterprise platform, rather than allocating development resources and time to building out an IoT interface and application platform.

Case Study
Bridge monitoring in Hamburg Port
Kattwyk Bridge is used for both rail and road transport, and it has played an important role in the Port of Hamburg since 1973. However, the increasing pressure from traffic requires a monitoring solution. The goal of the project is to assess in real-time the bridge's status and dynamic responses to traffic and lift processes.

Case Study
Bellas Landscaping
Leading landscaping firm serving central Illinois streamlines operations with Samsara’s real-time fleet tracking solution: • 30+ vehicle fleet includes International Terrastar dump trucks and flatbeds, medium- and light-duty pickups from Ford and Chevrolet. Winter fleet includes of snow plows and salters.