Customer Company Size
Mid-size Company
Region
- America
Country
- United States
Product
- SimpliVity’s OmniCube
Tech Stack
- VMware
- Microsoft Exchange
- MSFT SQL Server
Implementation Scale
- Enterprise-wide Deployment
Impact Metrics
- Cost Savings
- Productivity Improvements
Technology Category
- Infrastructure as a Service (IaaS) - Cloud Computing
Applicable Functions
- Discrete Manufacturing
- Maintenance
Use Cases
- Manufacturing System Automation
- Predictive Maintenance
Services
- System Integration
About The Customer
Wausau Coated Products is a mid-sized manufacturing firm specializing in specialty coated papers and foils. The company prides itself on leveraging technology for competitive advantage, both in their manufacturing processes and in their IT environment. The IT team at Wausau custom writes all of their ERP and accounting software in-house, and is responsible for supporting the software and programs that drive critical business decisions. The company operates two facilities, connected via private fiber, and ships billions of square inches of specialty paper per year. Downtime in their operations can cause significant disruption and cost.
The Challenge
Wausau Coated Products, a mid-sized manufacturing firm, was looking to simplify its IT infrastructure while maintaining 24×7 uptime requirements. The company needed to improve its disaster recovery, business continuity, and backup capabilities, and reduce operational costs. The IT environment at Wausau is sophisticated, with the team custom writing all of their ERP and accounting software in-house. Given the ERP system's role in running the operations of the business, downtime could not be tolerated. The company was also looking for a solution that was simple to manage, enabled significant operational cost savings, scaled in simple, low-cost increments, maintained high performance under system load, enabled rapid clones, and provided 24/7 support.
The Solution
Wausau Coated Products chose SimpliVity’s OmniCube as their solution. The OmniCube was able to provide a “data-center-in-a-box” solution that met all of Wausau’s criteria. The implementation was straightforward and quick, with all virtual machines and business applications migrated to OmniCube without any downtime or business impact. The company was able to decommission their legacy infrastructure, including costly third-party backups, service, and maintenance expenses. The OmniCube implementation also improved Wausau’s disaster recovery operation, with policies established for each VM to back them up to the remote site.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.

Case Study
Remote Monitoring & Predictive Maintenance App for a Solar Energy System
The maintenance & tracking of various modules was an overhead for the customer due to the huge labor costs involved. Being an advanced solar solutions provider, they wanted to ensure early detection of issues and provide the best-in-class customer experience. Hence they wanted to automate the whole process.

Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.

Case Study
Plastic Spoons Case study: Injection Moulding
In order to meet customer expectations by supplying a wide variety of packaging units, from 36 to 1000 spoons per package, a new production and packaging line needed to be built. DeSter wanted to achieve higher production capacity, lower cycle time and a high degree of operator friendliness with this new production line.

Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.

Case Study
Aircraft Predictive Maintenance and Workflow Optimization
First, aircraft manufacturer have trouble monitoring the health of aircraft systems with health prognostics and deliver predictive maintenance insights. Second, aircraft manufacturer wants a solution that can provide an in-context advisory and align job assignments to match technician experience and expertise.

Case Study
Integral Plant Maintenance
Mercedes-Benz and his partner GAZ chose Siemens to be its maintenance partner at a new engine plant in Yaroslavl, Russia. The new plant offers a capacity to manufacture diesel engines for the Russian market, for locally produced Sprinter Classic. In addition to engines for the local market, the Yaroslavl plant will also produce spare parts. Mercedes-Benz Russia and his partner needed a service partner in order to ensure the operation of these lines in a maintenance partnership arrangement. The challenges included coordinating the entire maintenance management operation, in particular inspections, corrective and predictive maintenance activities, and the optimizing spare parts management. Siemens developed a customized maintenance solution that includes all electronic and mechanical maintenance activities (Integral Plant Maintenance).