Technology Category
- Functional Applications - Enterprise Asset Management Systems (EAM)
- Functional Applications - Transportation Management Systems (TMS)
Applicable Industries
- Construction & Infrastructure
- Transportation
Applicable Functions
- Logistics & Transportation
- Maintenance
Use Cases
- Asset Lifecycle Management
- Traffic Monitoring
Services
- System Integration
- Training
About The Customer
The Oregon Department of Transportation (ODOT) is a government agency responsible for the establishment and regulation of the state's transportation infrastructure. This includes the management of over 8,000 miles of state and interstate highways within Oregon. ODOT also oversees programs related to highways, roads and bridges, railways, public transportation services, transportation safety programs, and motor carrier regulation. The department is tasked with meeting state and federal reporting requirements, which necessitates a comprehensive understanding of what assets they have and where they are located. This challenge is compounded by the fact that the network with which they are associated is constantly changing.
The Challenge
The Oregon Department of Transportation (ODOT) is responsible for managing over 8,000 miles of state and interstate highways within Oregon, along with programs related to highways, roads and bridges, railways, public transportation services, transportation safety programs, and motor carrier regulation. Previously, ODOT managed their transportation assets using legacy systems that ran on various technologies, performed functions they were not originally designed for, and duplicated data across multiple repositories. Meeting government reporting requirements involved months of custom coding, manual updating, and vigilant error-checking. ODOT needed a new, comprehensive, linear asset management solution – one that would enable more efficient data capture, analysis, and information mobility that would streamline processes and improve regulatory reporting.
The Solution
ODOT implemented TransInfo, a USD 3.3 million linear asset management system built on Bentley’s AssetWise asset performance software. This system created a connected data environment where information integrity and availability is assured. TransInfo provides a unified view of the entire road network and associated features, integrates all assets into a single information and asset management system, and maintains seamless spatial representations of all the data. AssetWise provides a single source of truth for ODOT to manage all roadway asset information including spatial network data, inventory and maintenance data, asset data, road geometry data, and road classification data. ODOT also began using Bentley’s Transportation Intelligence Gateway (TIG), which provides powerful and flexible operational analytics that are integrated into ODOT’s transactional system and uses linearly referenced data.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Airport SCADA Systems Improve Service Levels
Modern airports are one of the busiest environments on Earth and rely on process automation equipment to ensure service operators achieve their KPIs. Increasingly airport SCADA systems are being used to control all aspects of the operation and associated facilities. This is because unplanned system downtime can cost dearly, both in terms of reduced revenues and the associated loss of customer satisfaction due to inevitable travel inconvenience and disruption.
Case Study
IoT-based Fleet Intelligence Innovation
Speed to market is precious for DRVR, a rapidly growing start-up company. With a business model dependent on reliable mobile data, managers were spending their lives trying to negotiate data roaming deals with mobile network operators in different countries. And, even then, service quality was a constant concern.
Case Study
Digitize Railway with Deutsche Bahn
To reduce maintenance costs and delay-causing failures for Deutsche Bahn. They need manual measurements by a position measurement system based on custom-made MEMS sensor clusters, which allow autonomous and continuous monitoring with wireless data transmission and long battery. They were looking for data pre-processing solution in the sensor and machine learning algorithms in the cloud so as to detect critical wear.
Case Study
Cold Chain Transportation and Refrigerated Fleet Management System
1) Create a digital connected transportation solution to retrofit cold chain trailers with real-time tracking and controls. 2) Prevent multi-million dollar losses due to theft or spoilage. 3) Deliver a digital chain-of-custody solution for door to door load monitoring and security. 4) Provide a trusted multi-fleet solution in a single application with granular data and access controls.
Case Study
Vehicle Fleet Analytics
Organizations frequently implement a maintenance strategy for their fleets of vehicles using a combination of time and usage based maintenance schedules. While effective as a whole, time and usage based schedules do not take into account driving patterns, environmental factors, and sensors currently deployed within the vehicle measuring crank voltage, ignition voltage, and acceleration, all of which have a significant influence on the overall health of the vehicle.In a typical fleet, a large percentage of road calls are related to electrical failure, with battery failure being a common cause. Battery failures result in unmet service agreement levels and costly re-adjustment of scheduled to provide replacement vehicles. To reduce the impact of unplanned maintenance, the transportation logistics company was interested in a trial of C3 Vehicle Fleet Analytics.