Customer Company Size
Large Corporate
Region
- America
Country
- United States
Product
- Brocade 48000 Directors
- Hitachi Data Systems USP storage devices
Tech Stack
- Fibre Channel
- NAS environment
Implementation Scale
- Enterprise-wide Deployment
Impact Metrics
- Productivity Improvements
- Customer Satisfaction
Technology Category
- Infrastructure as a Service (IaaS) - Cloud Storage Services
Applicable Functions
- Discrete Manufacturing
- Logistics & Transportation
Use Cases
- Process Control & Optimization
- Real-Time Location System (RTLS)
- Predictive Maintenance
Services
- System Integration
- Cloud Planning, Design & Implementation Services
About The Customer
MediaNet Digital is a world leader in business-to-business digital entertainment. Based in New York City, the company provides the content and technologies that enable world-class brands to offer music and video download and subscription services to their customers. At its data center in Seattle, the company stores over a petabyte of digital content in a NAS environment, adding nearly a terabyte of new content every week from content providers. MediaNet Digital tracks consumer transactions via its partners’ Web sites and the company must compile this data into reports. The company also maintains strict Service Level Agreements (SLAs) with its partners.
The Challenge
MediaNet Digital, a New York-based company, provides content and technologies that enable brands to offer music and video download and subscription services to their customers. The company stores over a petabyte of digital content in a NAS environment, adding nearly a terabyte of new content every week from content providers. MediaNet Digital tracks consumer transactions via its partners’ Web sites and the company must compile this data into reports. However, the process of generating daily billing and activity reports was becoming increasingly time-consuming and the reliability issues with their storage solution were becoming more problematic as their demands grew. The company also maintains strict Service Level Agreements (SLAs) with its partners, making it crucial to find an advanced, enterprise-class solution.
The Solution
To address its storage challenges, MediaNet Digital opted for a data center fabric solution based on a Brocade SAN. The company considered systems from several storage vendors and their SAN switching partners but was impressed with the solution offered by Denver, Colorado based systems integrator, Advanced Systems Group (ASG). The ASG solution featured Hitachi Data Systems storage devices and Brocade 48000 Directors. The Brocade 48000 can deliver 4 or 8 Gbit/sec Fibre Channel full-duplex performance to as many as 384 concurrently active ports in a single domain, providing industry-leading throughput and scalability. The solution’s form factor also supports an unsurpassed 1,152 ports in each rack, maximizing space utilization in crowded data centers. In August 2007, with management support from ASG, MediaNet Digital deployed a pair of Brocade 48000 Directors in its data center, each with sixty-four 4 Gbit/sec ports to start, and linked them at 4 Gbit/sec speed to Hitachi Data Systems USP storage devices.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.

Case Study
Remote Monitoring & Predictive Maintenance App for a Solar Energy System
The maintenance & tracking of various modules was an overhead for the customer due to the huge labor costs involved. Being an advanced solar solutions provider, they wanted to ensure early detection of issues and provide the best-in-class customer experience. Hence they wanted to automate the whole process.

Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.

Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.

Case Study
Airbus Soars with Wearable Technology
Building an Airbus aircraft involves complex manufacturing processes consisting of thousands of moving parts. Speed and accuracy are critical to business and competitive advantage. Improvements in both would have high impact on Airbus’ bottom line. Airbus wanted to help operators reduce the complexity of assembling cabin seats and decrease the time required to complete this task.

Case Study
Aircraft Predictive Maintenance and Workflow Optimization
First, aircraft manufacturer have trouble monitoring the health of aircraft systems with health prognostics and deliver predictive maintenance insights. Second, aircraft manufacturer wants a solution that can provide an in-context advisory and align job assignments to match technician experience and expertise.