Case Studies.
Add Case Study
Our Case Study database tracks 18,927 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.
Download Excel
Filters
- (1)
Selected Filters
|
MultiFiber Pro Shows One Installation Contractor
Yet one such installation contractor found its progress grinding to a halt around a particularly thorny problem with an MPOdeployment. The company was in the midst of an installation comprised of two MPO fiber cassettes and a pre-tested and certified MPO trunk cable. And it wasn't going well.The manufacturer of the equipment they were using required that pass-fail limits be derived from the company's link loss calculator and then input into test tools such as a Fluke Networks DTX CableAnalyzer as a custom limit. And these custom limits are tight; stricter even than the traditional TIA-568-C industry standard. Total budgets of only 1.40 dB are common for two cassette links. And unfortunately, the installation contractor was struggling to get under this budget for one portion of a particular job.The installers repeatedly examined, cleaned, and retested the fibers without being able to solve the issue. As a result, the profitability for that particular job was vanishing with each additional hour of testing, driving the company to reach out to its distributor, which in turn put in a call to Fluke Networks.
|
|