Customer Company Size
Large Corporate
Region
- America
Country
- United States
Product
- JDA Demand
- JDA Fulfillment
Tech Stack
- Supply Chain Management Software
- Inventory Management Software
Implementation Scale
- Enterprise-wide Deployment
Impact Metrics
- Cost Savings
- Customer Satisfaction
- Productivity Improvements
Technology Category
- Functional Applications - Inventory Management Systems
- Functional Applications - Enterprise Resource Planning Systems (ERP)
Applicable Industries
- Chemicals
- Construction & Infrastructure
- Healthcare & Hospitals
Applicable Functions
- Logistics & Transportation
- Procurement
Use Cases
- Inventory Management
- Supply Chain Visibility
Services
- System Integration
About The Customer
Airgas, Inc. is the largest distributor of industrial, medical and specialty gases and welding equipment and supplies in the United States. The company is also one of the largest national distributors of safety products, a leading source of nitrous oxide, dry ice and liquid carbon dioxide, as well as process chemicals, refrigerants and ammonia products. The company employs more than 14,000 associates and serves a diverse customer base that includes welders and metal fabricators, construction firms, hospitals and clinics, nursing homes and home healthcare providers, equipment manufacturers and research laboratories. To meet the needs of its diverse customer base, Airgas built a nationwide distribution platform across multiple channels, including retail branches, distribution centers and inbound and outbound telemarketing centers. Airgas’ integrated network consists of approximately 1,100 locations, from retail stores serving walk-in customers to large distribution centers (DCs) strategically located across the U.S.
The Challenge
Airgas, Inc., the largest distributor of industrial, medical and specialty gases and welding equipment and supplies in the United States, faced unique supply chain challenges due to its large business network. The company had set ambitious goals for growth and profitability, implementing an aggressive business strategy driven by organic growth and numerous core, product line and strategic acquisitions. However, the company’s rapid, acquisition-fueled growth was not supported by its existing systems. Airgas used a mixture of legacy systems and industry-specific solutions to manage demand, but these systems were not integrated and could not scale to keep up with the company’s growth. Each of the company’s 12 regional operating companies ran its own version of a demand management solution, further complicating the need to manage almost 3.5 million items in a complex wholesale distribution environment. As a result, Airgas lacked the enterprise-wide view of supply and demand needed to optimize inventory, reduce costs and drive customer satisfaction.
The Solution
To solve its critical inventory balancing challenges, Airgas began evaluating automated demand and fulfillment systems. The company wanted a truly integrated supply chain management solution – one that would link suppliers and sub-suppliers, internal operations, trade customers, retail customers and end users. After a thorough review, Airgas selected JDA Demand and JDA Fulfillment, from JDA Software’s Intelligent Fulfillment™ solutions, to address its business challenges and achieve a global view of its inventory. Airgas leverages JDA Demand to manage more than one million demand forecast units and uses aggregation and reconciliation to forecast at multiple levels. The company generates monthly forecasts and publishes updates that are made by the demand planners daily. JDA Fulfillment allows Airgas to manage 250,000 unique items, including 912,000 stocked SKUs and more than 2.5 million non-stocked SKUs through its network of 1,500-plus vendors. The company runs its fulfillment plan nightly, generating more than 4,000 purchase orders in a typical business day.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Honeywell - Tata Chemicals Improves Data Accessibility with OneWireless
Tata was facing data accessibility challenges in the cement plant control room tapping signals from remote process control areas and other distant locations, including the gas scrubber. Tata needed a wireless solution to extend its control network securely to remote locations that would also provide seamless communication with existing control applications.
Case Study
Hospital Inventory Management
The hospital supply chain team is responsible for ensuring that the right medical supplies are readily available to clinicians when and where needed, and to do so in the most efficient manner possible. However, many of the systems and processes in use at the cancer center for supply chain management were not best suited to support these goals. Barcoding technology, a commonly used method for inventory management of medical supplies, is labor intensive, time consuming, does not provide real-time visibility into inventory levels and can be prone to error. Consequently, the lack of accurate and real-time visibility into inventory levels across multiple supply rooms in multiple hospital facilities creates additional inefficiency in the system causing over-ordering, hoarding, and wasted supplies. Other sources of waste and cost were also identified as candidates for improvement. Existing systems and processes did not provide adequate security for high-cost inventory within the hospital, which was another driver of cost. A lack of visibility into expiration dates for supplies resulted in supplies being wasted due to past expiry dates. Storage of supplies was also a key consideration given the location of the cancer center’s facilities in a dense urban setting, where space is always at a premium. In order to address the challenges outlined above, the hospital sought a solution that would provide real-time inventory information with high levels of accuracy, reduce the level of manual effort required and enable data driven decision making to ensure that the right supplies were readily available to clinicians in the right location at the right time.
Case Study
Advanced Elastomer Systems Upgrades Production
In order to maintain its share of the international market for thermoplastic elastomers AES recently expanded its Florida plant by adding a new production line. While the existing lines were operating satisfactorily using a PROVOX distributed control system with traditional analog I/O, AES wanted advanced technology on the new line for greater economy, efficiency, and reliability. AES officials were anxious to get this line into production to meet incoming orders, but two hurricanes slowed construction.
Case Study
Gas Pipeline Monitoring System for Hospitals
This system integrator focuses on providing centralized gas pipeline monitoring systems for hospitals. The service they provide makes it possible for hospitals to reduce both maintenance and labor costs. Since hospitals may not have an existing network suitable for this type of system, GPRS communication provides an easy and ready-to-use solution for remote, distributed monitoring systems System Requirements - GPRS communication - Seamless connection with SCADA software - Simple, front-end control capability - Expandable I/O channels - Combine AI, DI, and DO channels