Technology Category
- Sensors - Acoustic Sensors
- Sensors - Haptic Sensors
Applicable Industries
- Equipment & Machinery
- Transportation
Applicable Functions
- Product Research & Development
Use Cases
- Time Sensitive Networking
- Visual Quality Detection
Services
- System Integration
About The Customer
The customer in this case is the production team of Star Wars: The Force Awakens, led by director JJ Abrams. The team includes editors Maryann Brandon, ACE, and Mary Jo Markey, ACE, both of whom once again joined the director for what is considered an even bigger adventure of his career as he reintroduced Star Wars. Associate editors Julian Smirke and Matt Evans rejoined Abrams, Brandon, and Markey, having worked with the trio on Mission: Impossible III, and every Abrams film thereafter. The team works at Bad Robot, Abrams’ film and television production company, where work on the director’s projects, including The Force Awakens, is done.
The Challenge
The challenge was to edit the long-awaited, VFX-heavy film Star Wars: The Force Awakens. The film was shot using a variety of cameras and formats, including 35mm, 65mm, digital, and 3D for final delivery. The film was also shot primarily at 35mm cinemascope and 65mm IMAX for some scenes. The editing team had to manage these different formats and ensure a seamless final product. Additionally, the film was a top-secret project, requiring secure storage solutions for the files. The team also had to incorporate a temporary 5.1 surround sound mix, which was a new workflow for them.
The Solution
The team relied on Avid Artist Suite creative solutions for editing the multi-formatted, story-driven scenes. They used anywhere from eight to 12 Media Composer systems, depending on where they were in the process. They also used Avid Storage Suite shared media storage, which is connected at Bad Robot via Ethernet, so employees can collaborate and be added easily as needed. To make the assets more manageable and trackable for other users, associate editors Julian Smirke and Matt Evans generated a database for marketing and management to use for locating specific shots and technical information as needed. The main editorial codebook, created using VFX editor Martin Kloner’s FileMaker Pro databases, includes all the dailies imported from Avid bins. That codebook links up to all the other databases used for the visual effects, continuity, ADR (automated dialog replacement), and turnovers.
Operational Impact
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Data Gathering Solution for Joy Global
Joy Global's existing business processes required customers to work through an unstable legacy system to collect mass volumes of data. With inadequate processes and tools, field level analytics were not sufficient to properly inform business decisions.