About The Customer
Gippsland Water is a leading supplier of high-quality water, wastewater, and waste recovery services in regional Victoria, Australia. The company is responsible for meeting the needs of 65,000 customers across 43 towns, including seven industries of national significance. Gippsland Water is committed to providing the best service to its customers while striving to do more with less. The company is focused on enhancing efficiency, lowering tariffs, reducing costs, and maintaining high-quality services. Gippsland Water also aims to eliminate double handling and increase staff engagement.
The Challenge
Gippsland Water, one of the largest suppliers of high-quality water, wastewater, and waste recovery services in regional Victoria, Australia, was faced with the challenge of meeting the needs of 65,000 customers in 43 towns, including seven industries of national significance. The company was tasked with the question of how to provide the best service to customers while doing more with less. The ultimate goal was to enhance efficiency by lowering tariffs and reducing costs from the business while still maintaining high-quality services. The company also aimed to eliminate double handling and increase staff engagement. The challenge was to transform the way the company worked, improve processes, and increase efficiency.
The Solution
Gippsland Water embarked on a three-year journey of process mapping using Nintex Promapp as their improvement tool. The project began by differentiating between core, support, and management processes. The key processes that tied everything together were then prioritized. Nintex Promapp enabled the project team to visibly represent all the processes across the company, making it easy to plot and identify which business unit was accountable for which process. The intuitive flow of the process mapping tool allowed the team to transparently show how each process directly linked to Gippsland Water’s vision of providing efficient water and wastewater services for a healthy community environment. The tool also integrated with existing setups, eliminating the need to create new processes and procedures. The company also incorporated their training videos into Nintex Promapp.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.