Applicable Industries
- Equipment & Machinery
Applicable Functions
- Procurement
Use Cases
- Time Sensitive Networking
About The Customer
Internap (INAP) is a high-performance data center services provider based in Atlanta, GA. They offer a range of services including cloud solutions, managed hosting, and colocation. The company is committed to delivering high-performance internet infrastructure that is reliable, secure, and scalable. The Talent Acquisition Team at INAP plays a crucial role in sourcing the right talent to support the company's operations and growth. The team, led by Michael Crouse, the Senior Manager of Talent Acquisition, is responsible for filling a variety of roles across multiple departments.
The Challenge
Internap (INAP), a high-performance data center services provider, was faced with a significant challenge in their Talent Acquisition department. The team was inundated with a high volume of requisitions that needed to be filled within a short timeframe. These roles spanned across multiple departments, many of which were critical to the business needs. The situation was further complicated by the fact that the team had a limited number of recruiters to handle the workload. Michael Crouse, the Senior Manager of Talent Acquisition, was in dire need of a sourcing tool that could help his team quickly identify and qualify a large talent pool.
The Solution
After evaluating several tools, Michael Crouse decided to implement Hiretual Pro to address the sourcing challenge. Hiretual Pro is a powerful AI-driven recruitment software that helps recruiters and HR teams to source and engage the right candidates faster. The tool was chosen for its ability to quickly produce a rich selection of candidates for every search. The results provided by Hiretual Pro were found to be 80-90% on target, and the contact information it provided was 98% accurate. This allowed the Talent Acquisition team at INAP to streamline their sourcing process and fill the roles more efficiently.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Data Gathering Solution for Joy Global
Joy Global's existing business processes required customers to work through an unstable legacy system to collect mass volumes of data. With inadequate processes and tools, field level analytics were not sufficient to properly inform business decisions.