Technology Category
- Sensors - Autonomous Driving Sensors
- Sensors - Camera / Video Systems
Applicable Industries
- Education
- Equipment & Machinery
Use Cases
- Behavior & Emotion Tracking
- Visual Quality Detection
About The Customer
The customer in this case is Danny Ramirez, a talented writer, director, and film editor who is a fan of the Star Wars franchise. He wrote, directed, and edited Vader Episode 1: Shards of the Past, a cinema-quality episodic film. Ramirez has a background in editing and has worked on narratives, documentaries, and other types of films. He studied directing at USC and has a master's degree. He has also worked as an assistant editor on feature films like Wonder Park. Ramirez is deeply involved in the entire process of creating a film, from writing the first draft to the finished product.
The Challenge
The challenge was to create a fan-made film about Darth Vader, one of the most complex and interesting characters in the Star Wars universe. The film needed to be of cinema-quality and had to be accepted by the Star Wars community, which is known for its rigorous debates about what is considered legitimate and what is not. The film also had to be shared online without any advertising. The process of creating the film involved various stages including writing, directing, editing, and coordinating with remote staff. The challenge also included the need for a tool that could enhance the ability of the team to deliver the story quickly and enable richer collaboration.
The Solution
The team used Avid Media Composer | Ultimate, a non-linear video editing software, to create the film. This tool provided the editing features that could be used by team members in every capacity, whether reviewing footage, setting up projects, coordinating with remote staff, rewriting scenes, or driving the entire production as a writer, editor, and director. The software was used to edit the film, create special effects, and export for VFX. The team also used other tools like After Effects, Nuke, and Maya for other effects. The film was shot in just three and a half days with one camera and the post-production process took almost three months.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Data Gathering Solution for Joy Global
Joy Global's existing business processes required customers to work through an unstable legacy system to collect mass volumes of data. With inadequate processes and tools, field level analytics were not sufficient to properly inform business decisions.