Technology Category
- Analytics & Modeling - Computer Vision Software
Applicable Industries
- Buildings
- Equipment & Machinery
Use Cases
- Smart Campus
- Time Sensitive Networking
Services
- System Integration
About The Customer
The customer in this case study is the production team of 'The Amazing Spider-Man', led by Director Marc Webb. The team includes editor Alan Edward Bell, A.C.E., and assistant editor Jennifer Vecchiarello. The team was tasked with rebooting the franchise with a fresh origin story for one of the most iconic comic book characters of all time, Spider-Man. The film was a significant departure from their previous project, 'Water for Elephants', in terms of the amount of footage and the need for special effects. The team recognized the need for a powerful workflow and effective collaboration to manage the project efficiently.
The Challenge
The production team of 'The Amazing Spider-Man' faced a significant challenge in managing and editing a massive amount of footage and special effects. The film, being a reboot of the franchise, required quick and impactful editing to deliver a fresh and compelling narrative. The team, led by editor Alan Edward Bell and assistant editor Jennifer Vecchiarello, had to deal with a project starkly different from their previous ones, with the complexity of the footage and the need for special effects making it a different game altogether. The team recognized the need for effective collaboration and a powerful workflow to manage the project efficiently.
The Solution
The team leveraged the openness of Media Composer, a product by Avid, to streamline their workflows and collaborate effectively. The system allowed multiple editing systems to be connected and shared projects with the team, making collaboration almost effortless. The team had a total of eight Media Composer stations connected to the Unity system, each equipped with an Avid Nitris DX I/O box and either a Marshall 3D monitor or 2D monitors with converter boxes. The Media Composer | ScriptSync Option became indispensable to their workflow, allowing them to effortlessly locate all takes of any dialog line and eliminate hours of routine work. Bell also customized his editing solution by integrating third-party software, such as Fusion from eyeon Software, into his workflow.
Operational Impact
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Energy Saving & Power Monitoring System
Recently a university in Taiwan was experiencing dramatic power usage increases due to its growing number of campus buildings and students. Aiming to analyze their power consumption and increase their power efficiency across 52 buildings, the university wanted to build a power management system utilizing web-based hardware and software. With these goals in mind, they contacted Advantech to help them develop their system and provide them with the means to save energy in the years to come.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.