Technology Category
- Sensors - Acoustic Sensors
- Sensors - Camera / Video Systems
Applicable Industries
- Buildings
- Equipment & Machinery
Applicable Functions
- Facility Management
- Logistics & Transportation
Use Cases
- Time Sensitive Networking
- Track & Trace of Assets
Services
- System Integration
About The Customer
SVT is the largest television broadcaster in Sweden, based in Stockholm. It produces a wide range of programming, from dramas to comedies, live shows to documentaries, sports to news programs. SVT produces approximately 2,000 hours of original programming per year in both HD and SD. The broadcaster operates nearly 30 facilities located throughout Sweden, including four main production centers in Stockholm, Gothenburg, Malmo, and Umea. SVT is committed to producing top-quality programming, increasing collaboration among media professionals, and maximizing the value of its media assets.
The Challenge
Stockholm-based SVT, the largest television broadcaster in Sweden, produces approximately 2,000 hours of original programming per year in HD and SD. The challenge was to produce this high-quality programming quickly and cost-effectively. The broadcaster was looking to increase collaboration among media professionals and maximize the value of its media assets. With nearly 30 facilities located throughout Sweden, SVT needed a solution that would enhance collaboration between team members, who needed to share files, projects, and media across the entire network with near instantaneous speed. The broadcaster also wanted to make its systems more efficient and unify the workflow throughout the company.
The Solution
SVT implemented a complete end-to-end Avid workflow based on the Avid MediaCentral platform. The interconnected setup includes nine Avid Interplay | Production asset management systems plus Avid ISIS shared storage systems for digital collaboration, all connected via the same platform. More than 300 Avid editing workstations and 20 Pro Tools systems are also available for video and audio editing at its four main production centers in Stockholm, Gothenburg, Malmo, and Umea and at another 25 regional broadcast facilities throughout the country. The four production centers act as the linchpin for this workflow, using Interplay systems for workgroup and proxy capabilities and ISIS systems for simultaneous access to and sharing of projects and media. This setup accommodates virtually any SD and HD format, including DVCPro, DVC Pro HD, and HDCAM SR as SVT continues its move toward an all-HD workflow.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Energy Saving & Power Monitoring System
Recently a university in Taiwan was experiencing dramatic power usage increases due to its growing number of campus buildings and students. Aiming to analyze their power consumption and increase their power efficiency across 52 buildings, the university wanted to build a power management system utilizing web-based hardware and software. With these goals in mind, they contacted Advantech to help them develop their system and provide them with the means to save energy in the years to come.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.