Technology Category
- Sensors - Acoustic Sensors
Applicable Industries
- Equipment & Machinery
Use Cases
- Onsite Human Safety Management
- Track & Trace of Assets
About The Customer
Jintae Ko is a GRAMMY Award-winning songwriter and producer for the Disney Music Group and its subsidiary Hollywood Records. He collaborates with a wide range of artists, including Bea Miller, Olivia Holt, Paty Cantu, Jason Derulo, Julia Michaels, Lindy Robbins, Sasha Sloan, Natalia Druyts, ZZ Ward, and the groups Forever in Your Mind and Joywave, among others. Jintae believes in the power of collaboration and uses Avid Pro Tools to create and share music with songwriters. He values the ability to relate and develop a human connection with other artists and songwriters, which he believes is crucial in creating truly new music.
The Challenge
The music industry is a highly competitive field that requires songwriters and producers to have powerful and user-friendly audio recording, editing, and mixing software. This software should facilitate collaboration and sharing of work among music creators, thereby driving creativity. The challenge lies in finding a tool that is not only easy to use but also allows songwriters and producers to listen, edit, and mix their recorded projects effectively. This is crucial in enabling them to collaborate with musicians and create high-quality music.
The Solution
Pro Tools, a digital audio workstation, has emerged as a solution to this challenge. It is user-friendly and allows songwriters and producers to listen to their recorded projects while editing and mixing. This feature facilitates collaboration with musicians and the creation of high-quality music. Pro Tools is referred to as the 'mothership of all digital audio workstations' because it allows users to hear every detail of their music, manipulate other ingredients like loops, and enhance every detail. This tool enables the creation of music more easily by providing a clear idea of how the music sounds. It also aids in the organization of sounds for different music styles, making it easier for producers to find the right sound for their projects.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Data Gathering Solution for Joy Global
Joy Global's existing business processes required customers to work through an unstable legacy system to collect mass volumes of data. With inadequate processes and tools, field level analytics were not sufficient to properly inform business decisions.