Technology Category
- Processors & Edge Intelligence - System on a Chip
- Sensors - Liquid Detection Sensors
Applicable Industries
- Buildings
- Equipment & Machinery
Applicable Functions
- Product Research & Development
Use Cases
- Time Sensitive Networking
About The Customer
Faraday Technology Corporation is a leading fabless ASIC vendor and silicon intellectual property (SIP) provider. The company's success is built on its ability to provide highly customized solutions for its customers. Faraday's proven and recognized ASIC, system-on-chip (SoC), and intellectual property (IP) design capabilities and services enable customers to realize their ideas in silicon—better and faster—and to gain a competitive edge through lower cost and higher product differentiation. Since its launch in 1993, Faraday has provided professional ASIC design services, equipped with a well-developed ASIC infrastructure and team members with an average of more than 10 years of experience. Faraday's in-house IP includes thousands of ARM-compliant CPUs, high-speed I/Os, memory interfaces, and fundamental IPs such as libraries, memories, PLLs, and regulators.
The Challenge
Faraday Technology Corporation, a leading fabless ASIC vendor and SIP provider, faced a significant challenge in updating its engineering change order (ECO) process. The ECO process involves inserting a logic change directly into the netlist after an automatic tool has already processed it. This could include anything from adding or removing logic in a design to a more subtle change such as cleaning up routing for signal integrity. However, ECOs can be stressful and time-consuming. Traditional manual ECO flows are labor-intensive and limited in their ability to ensure that a product will function properly. Designers often don't know if a change made in the logical netlist can be executed in the physical netlist, making the manual ECO process time-consuming and effort-intensive. It was also difficult to accurately keep track of used spare cells and freed cells.
The Solution
To address its ECO challenges, Faraday decided to implement Cadence's Encounter Conformal ECO Designer. This tool offers functional ECO analysis and optimization, and generation capability. It combines proven equivalence and functional checks, and uses formal techniques to analyze, abstract, and implement ECOs. Conformal ECO Designer compares each logic cone in the design, determines which cones are different, and identifies what changes are required to complete the ECO. This minimizes the number of changes and reduces the impact on back-end processing, which accelerates turnaround time. In the post-mask flow, ECO changes are mapped to available gates or freed gates. Conformal ECO Designer informs the user about any resource shortages. This solution allowed Faraday to handle complex ECOs that would otherwise take a significant amount of time and may even be impossible to perform using traditional manual methods.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Energy Saving & Power Monitoring System
Recently a university in Taiwan was experiencing dramatic power usage increases due to its growing number of campus buildings and students. Aiming to analyze their power consumption and increase their power efficiency across 52 buildings, the university wanted to build a power management system utilizing web-based hardware and software. With these goals in mind, they contacted Advantech to help them develop their system and provide them with the means to save energy in the years to come.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.