Technology Category
- Analytics & Modeling - Real Time Analytics
- Infrastructure as a Service (IaaS) - Cloud Middleware & Microservices
Applicable Industries
- Cement
- Equipment & Machinery
Applicable Functions
- Product Research & Development
- Quality Assurance
Use Cases
- Real-Time Location System (RTLS)
- Virtual Prototyping & Product Testing
Services
- Hardware Design & Engineering Services
- Testing & Certification
About The Customer
The customer in this case study is not explicitly mentioned. However, it can be inferred that the customer is a global company launching a new product. The customer has multiple stakeholders whose interests needed to be incorporated into the design of a single page microsite for the product launch. The customer required low to medium fidelity assets, along with documentation. The wireframes could be grayscale, and 90% pixel accuracy was sufficient. The customer also had a global client base, necessitating a fast, efficient, and flexible solution.
The Challenge
The case study revolves around a project led by John Henry Krahenbuhl, Lead User Experience Designer at Epsilon, for a product launch microsite. The project faced several challenges. Firstly, it had to cater to the interests of multiple client stakeholders, all on a single page. Secondly, consensus had to be reached among the members of a cross-functional team at the agency. Lastly, all this had to be achieved quickly in a distributed work environment. The team consisted of about five core members, with several more who floated in and out as needed. The team was globally distributed, and the client base was also global. The project required fast, efficient, and flexible solutions. The client needed low to medium fidelity assets, along with documentation. The wireframes could be grayscale, and 90% pixel accuracy was sufficient.
The Solution
To address the challenge of incorporating multiple stakeholder interests, Krahenbuhl proposed the use of an image carousel. Despite the controversial nature of carousels among designers, it was seen as a practical solution to represent all products well in the deliverables. To facilitate collaboration in a distributed work environment, Krahenbuhl used Axure Share, a tool that allowed him to share an HTML link to the prototype that could be opened on any browser. This enabled real-time changes during conversations to adjust the interactions as they iterated. To address the various questions about the design, a prototype was quickly built to simulate the experience and shared with everyone on the team during the design exploration stage. This helped focus the conversation on the carousel interaction and how it affected the overall experience. The design was evolved in real time, with the original concept of sliding images from left to right being replaced with a fade effect. The prototype helped the team think through all the visual requirements and develop guidelines for the content.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.

Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.

Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.

Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.

Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.

Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.

Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.