Technology Category
- Application Infrastructure & Middleware - Event-Driven Application
- Automation & Control - Human Machine Interface (HMI)
Applicable Industries
- Buildings
- Equipment & Machinery
Applicable Functions
- Human Resources
- Product Research & Development
Use Cases
- Smart Campus
- Time Sensitive Networking
Services
- System Integration
About The Customer
Baylor University is a private Baptist university located in Waco, Texas. It is a nationally ranked liberal arts institution and the oldest continually operating university in the state, chartered in 1845 by the Republic of Texas. The university has over 12,000 enrolled undergraduates and hundreds of academic and administrative professionals. Baylor operates under a centralized IT office which services its users on the main campus as well as satellite locations. The Information Technology Services department (ITS) is responsible for identifying, developing, and supporting the University Technology Infrastructure to provide direct and indirect services for the entire University. Part of the ITS department's charter is to provide planning, development, and leadership, and to investigate new technologies.
The Challenge
Baylor University, a private Baptist university in Waco, Texas, was facing challenges with its workflow associated with financial requests. The university had been using a custom solution from a Project Management Software vendor, which was found to be limiting due to its poor user interface, high customization costs, and limited scalability across departments. The existing system made end user adoption difficult and was not purpose-built for managing requests. In the university setting, any activity with financial impact had to pass through a rigorous workflow, getting reviewed or approved by various stakeholders. The Information Technology Services (ITS) department at Baylor was tasked with finding a technology solution that would replace manual and paper-based processes, centralize and streamline the review and approval process for budget-impacting requests, and provide a clear understanding of the full impact of requests by involving all necessary areas such as Budget, Human Resources, and Facilities Services.
The Solution
Baylor University implemented a workflow and document management application with Integrify to centralize and streamline the data entry and approval of all departmental requests that impact the budget. The university installed a license of Integrify on their own on-site server and customized their version as “BearQuest” with the Baylor logos. The solution was rolled out campus-wide, with hundreds of potential requestors and upwards of 100 defined “approvers”. The Integrify solution allowed Baylor to simplify and in some cases reduce the need for human data entry, saving time and potential mistakes. It integrated with Baylor's proprietary .NET Employment Management System (EMS), pulling data from ERP systems during the request process. The rollout of Integrify also allowed Baylor to evaluate how it was doing its approvals and optimize its automation accordingly. The solution provided real-time and 360-degree visibility into the project lifecycle for the request, and allowed users to select the proper request type, initiating a complex flow for high-value requests and a simplified flow for low-impact requests.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Energy Saving & Power Monitoring System
Recently a university in Taiwan was experiencing dramatic power usage increases due to its growing number of campus buildings and students. Aiming to analyze their power consumption and increase their power efficiency across 52 buildings, the university wanted to build a power management system utilizing web-based hardware and software. With these goals in mind, they contacted Advantech to help them develop their system and provide them with the means to save energy in the years to come.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.