公司规模
Large Corporate
地区
- Asia
国家
- Russia
产品
- NimBus
- Wialon
技术栈
- QR code technology
- Real-time tracking
实施规模
- Enterprise-wide Deployment
影响指标
- Employee Satisfaction
- Productivity Improvements
技术
- 应用基础设施与中间件 - API 集成与管理
适用行业
- 石油和天然气
适用功能
- 物流运输
用例
- 车队管理
- 实时定位系统 (RTLS)
服务
- 系统集成
关于客户
SIBUR Tobolsk is a large petrochemical plant located in Siberia, Russia. The plant employs several thousand workers, many of whom are not local residents and are unfamiliar with the city. The plant is committed to providing comfortable working conditions for all its employees, which includes efficient and reliable transportation to and from the workplace. The plant was in need of a centralized tool for managing employee transportation.
挑战
SIBUR Tobolsk, a large petrochemical plant in Siberia, faced a significant challenge in transporting its employees to their workplaces. Many of the plant's several thousand workers were not local residents and were unfamiliar with the city upon their arrival. The plant needed a centralized tool for employee transportation to ensure comfortable working conditions for all employees.
解决方案
PK SKT, a partner of Wialon, proposed the use of the NimBus application for managing passenger transportation for this project. The specialists built up 300 routes in NimBus, set up schedules and stops, and trained dispatchers to edit and reassign routes and rides if necessary. A QR code provided by the company links to Locator, which shows the bus location on the map in real-time. This solution allowed for efficient and reliable transportation of employees to and from their workplaces.
运营影响
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.

Case Study
Taking Oil and Gas Exploration to the Next Level
DownUnder GeoSolutions (DUG) wanted to increase computing performance by 5 to 10 times to improve seismic processing. The solution must build on current architecture software investments without sacrificing existing software and scale computing without scaling IT infrastructure costs.

Case Study
Remote Wellhead Monitoring
Each wellhead was equipped with various sensors and meters that needed to be monitored and controlled from a central HMI, often miles away from the assets in the field. Redundant solar and wind generators were installed at each wellhead to support the electrical needs of the pumpstations, temperature meters, cameras, and cellular modules. In addition to asset management and remote control capabilities, data logging for remote surveillance and alarm notifications was a key demand from the customer. Terra Ferma’s solution needed to be power efficient, reliable, and capable of supporting high-bandwidth data-feeds. They needed a multi-link cellular connection to a central server that sustained reliable and redundant monitoring and control of flow meters, temperature sensors, power supply, and event-logging; including video and image files. This open-standard network needed to interface with the existing SCADA and proprietary network management software.

Case Study
Refinery Saves Over $700,000 with Smart Wireless
One of the largest petroleum refineries in the world is equipped to refine various types of crude oil and manufacture various grades of fuel from motor gasoline to Aviation Turbine Fuel. Due to wear and tear, eight hydrogen valves in each refinery were leaking, and each cost $1800 per ton of hydrogen vented. The plant also had leakage on nearly 30 flare control hydrocarbon valves. The refinery wanted a continuous, online monitoring system that could catch leaks early, minimize hydrogen and hydrocarbon production losses, and improve safety for maintenance.