技术
- 基础设施即服务 (IaaS) - 云计算
- 平台即服务 (PaaS) - 应用开发平台
适用行业
- 水泥
- 矿业
用例
- 楼宇自动化与控制
- 时间敏感网络
服务
- 系统集成
关于客户
Riot Games 是一家总部位于加利福尼亚州洛杉矶的游戏公司。他们最出名的是《英雄联盟》游戏,该游戏拥有超过 1.5 亿注册用户,是全球最受欢迎的游戏赛事之一。 Riot Games 非常注重工程设计,在全球 20 多个办事处拥有 2,500 多名员工。
挑战
《英雄联盟》背后的游戏公司 Riot Games 一直在努力从其游戏生成的大量数据中获取价值。分析师需要正确的数据来获得见解,而工程师则因回答有关数据的重复问题而不知所措。
解决方案
Riot Games 实施了数据智能平台 Alation,以帮助分析师和工程师更加智能地处理数据。分析师使用 Alation 来发现用于分析的可信数据、深入探索数据以及在 Tableau 中运行查询和创建报告。工程师使用 Alation 来编目和管理元数据,减少分析师的直接询问。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Underground Mining Safety
The goal was to produce a safety system to monitor and support underground mining operations; existing systems were either too simple (i.e. phone line) or overly complex and expensive, inhibiting deployment, and providing little-to-no support in event of an accident. Given the dangerous nature of the mining work environment and the strict regulations placed on the industry, the solution would have to comply with Mine Safety and Health Administration (MSHA) regulations. Yet the product needed to allow for simple deployment to truly be a groundbreaking solution - increasing miner safety and changing daily operations for the better.
Case Study
Mining Firm Quadruples Production, with Internet of Everything
Dundee Precious Metal’s flagship mine, in Chelopech, Bulgaria, produces a gold, copper, and silver concentrate set a goal to increase production by 30%. Dundee wanted to increase production quality and output without increasing headcount and resources, improve miner safety, and minimize cost.
Case Study
Fastenal Builds the Future of Manufacturing with MachineMetrics
Fastenal's objective was to better understand their machine downtime, utilization, quality issues, and to embrace cutting-edge manufacturing technology/process improvement capabilities to bring their team to the next level. However, there was a lack of real-time data, visualization, and actionable insights made this transition impossible.
Case Study
Joy Mining Systems
Joy equipment faces many challenges. The first is machine integration and control. The business end of the machine has a rapidly-spinning cylinder with 6-inch diamond-studded cutting teeth. It chews through rock at rates measured in tens of tons per minute. The system grinds through the rock in front, creating a rectangular mine tunnel. Hydraulic lifters support the ceiling as the machine moves forward. Automated drills and screws drive 3-ft long screws into the ceiling to stabilize it. The rock and coal fall into a set of gathering "fingers" below the cutting cylinder. These fingers scoop up the rock and coal and deposit it onto a conveyor belt. The conveyor passes under the machine and out the back. A train of conveyor belt cars, up to a mile long, follows the cutter into the mine. The rock shoots along this train at over 400 feet per minute until it empties into rail cars at the end. Current systems place an operator cage next to the cutter. Choking dust (potentially explosive), the risk of collapse and the proximity of metal and rock mayhem make the operator cage a hazardous location.