实例探究 > Riyadh Dry Port's Transition to Virtual Environment Ensures Uninterrupted Operations

Riyadh Dry Port's Transition to Virtual Environment Ensures Uninterrupted Operations

公司规模
Large Corporate
地区
  • Middle East
国家
  • Saudi Arabia
产品
  • Navis N4
  • SAP
  • VMWare
技术栈
  • Virtualization
  • Data Center Infrastructure
  • Backup and Recovery Systems
实施规模
  • Enterprise-wide Deployment
影响指标
  • Productivity Improvements
  • Customer Satisfaction
  • Digital Expertise
技术
  • 平台即服务 (PaaS) - 数据管理平台
  • 基础设施即服务 (IaaS) - 云计算
适用行业
  • 运输
适用功能
  • 物流运输
  • 商业运营
用例
  • 预测性维护
  • 车队管理
  • 远程资产管理
服务
  • 系统集成
  • 云规划/设计/实施服务
关于客户
Riyadh Dry Port (RDP), located in Riyadh, the capital city of Saudi Arabia, is owned and operated by Baas International Group. It is the only dry port in Saudi Arabia that handles an import container volume of over 300,000 TEUs each year. RDP is connected to the Sea Port of Eastern Province in Dammam and is a rail facility, transporting containers by rail from Dammam Sea Port to Riyadh Dry Port. Since being taken over by BIG, RDP has achieved an average growth of 9.75% annually in import volumes. It is the only logistics hub in the Kingdom to implement and run on Navis N4 2.3. RDP values reliability and efficiency, having experienced firsthand the effects of unforeseen events. The port has continued to evolve with Navis N4 to maintain efficient, scalable, and flexible operations.
挑战
On October 5th, 2016, Riyadh Dry Port (RDP) faced a major electricity breakdown that brought all operations, systems, and technical departments to a standstill. This unexpected issue severely affected customers and stakeholders, as the port environment requires continuous operations. Every minute of system breakdown can have catastrophic side effects. However, the N4 system was the only one still operational, with no data loss at both sites. The data centers were supported by generators and a robust UPS system, allowing the primary and secondary data centers to run smoothly. Because N4 continued to operate, port operations were unaffected by the electricity impact. The BIG IT team emerged unscathed from the 7-hour electricity shutdown due to the robust and reliable IT infrastructure set up inside the port. The N4 systems remained stable and consistent, supporting other systems.
解决方案
Riyadh Dry Port (RDP) migrated their physical N4 systems to a virtual environment and set up secondary data centers to ensure 24/7 availability of their N4 2.3.10 system. The transition was smooth, with N4 adapting easily to the VMWare environment. RDP had two data centers, allowing data synchronization and replication at both sites. The transition was completed in approximately six to eight hours of downtime on a Friday, after which the physical servers for Navis and SAP were efficiently migrated to the VMWare virtual environment. RDP conducted appropriate unit testing and integration testing for both applications over three weeks, with all routine maintenance pre-scheduled upon confirmed downtime. The proven reliability of N4 in the event of a system breakdown has led to consistent growth for RDP. Navis N4 2.3 runs 24/7, 365 days a year with no downtime due to the backup site. N4 easily integrates with other applications, and running N4 and SAP together has leveraged operational efficiency to another level. The SAP Billing module retrieves its data from N4, and the front-end N4 application is scalable and easy to understand. N4 is the backbone of port operations at RDP, streamlining operational activities and improving gate and yard operations by more than 75%.
运营影响
  • RDP's transition to a virtual environment ensured 24/7 availability of their N4 system.
  • The N4 system remained operational during a 7-hour electricity breakdown, preventing data loss.
  • RDP's IT infrastructure proved robust and reliable, supporting continuous port operations.
  • N4's integration with SAP enhanced operational efficiency and streamlined activities.
  • RDP's consistent growth and increased container volumes demonstrate the effectiveness of their IT solutions.
数量效益
  • RDP achieved 350,000 TEU in 2015.
  • BIG registered a 13% growth in 2014, handling 305,000 TEU.
  • In 2013, BIG handled 270,000 TEU total.
  • RDP handled 1085 full import containers in one day, a 75% increase from 2012.
  • As of November 2016, BIG handled a total of 310,000 TEU.

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 Asia Growth Partners 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 Asia Growth Partners 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。