公司规模
Large Corporate
地区
- Europe
国家
- United Kingdom
产品
- FlowForma Process Automation
- FlowForma SureStart
技术栈
- Microsoft 365
- SharePoint
- GIS (Geographic Information System)
实施规模
- Enterprise-wide Deployment
影响指标
- Productivity Improvements
- Cost Savings
- Digital Expertise
技术
- 平台即服务 (PaaS) - 应用开发平台
- 应用基础设施与中间件 - 数据交换与集成
适用行业
- 建筑与基础设施
适用功能
- 离散制造
- 物流运输
用例
- 施工管理
- 过程控制与优化
- 实时定位系统 (RTLS)
服务
- 云规划/设计/实施服务
- 软件设计与工程服务
关于客户
A14 剑桥至亨廷顿改善计划是英国最大的公路建设项目。这是 Costain、Skanska 和 Balfour Beatty 投资 15 亿英镑的合资项目。该项目面临着所有现场工作都必须应对的业务流程方面的后勤挑战。A14 综合交付团队 (IDT) 迅速将三个现场大院与光纤宽带连接起来,从而能够通过电子邮件共享电子表格和其他信息。但是,仍有一些审批流程依赖于打印和物理共享文档以获得签字。由于系统中有大量纸张,文档不可避免地会丢失并出现错误。
挑战
A14 剑桥至亨廷顿改善计划是英国最大的公路建设项目,在业务流程方面面临后勤挑战。该项目是 Costain、Skanska 和 Balfour Beatty 之间的 15 亿英镑合资项目,必须处理依赖于打印和物理共享文件以供签署的审批流程。由于系统中有大量纸张,文件不可避免地会丢失,并且会出现错误。A14 IT 经理决心找到一种自动化工作流程解决方案,以消除对纸质流程的依赖,并为项目提供单一事实来源。该解决方案需要基于 SharePoint 平台构建,不需要编码技能,并且物有所值。
解决方案
A14 选择 FlowForma Process Automation 是因为它解决了所有优先事项。由于 Microsoft 365 和 SharePoint 是施工团队常用的平台,因此用户对该平台非常熟悉。无代码功能支持一项计划,使工作流程不再以 IT 为中心,并使更广泛的企业能够构建自己的流程。FlowForma Process Automation 与 Microsoft 的紧密集成意味着现有的 Microsoft 投资得到了最大化,因此价值主张得到了帮助。由于它是一项云服务,因此可以通过移动设备轻松访问,这对 A14 IDT 也很重要。为了全面掌握,A14 利用了 FlowForma SureStart,这是一个四步入职培训计划。IT 经理还得到了 FlowForma 客户成功团队的直接支持,该团队将指导他了解所有需要了解的内容。一旦他熟悉了它的逻辑,他很快就开始开发自己的“流程”。到目前为止,A14 IDT 已经开发了 24 个流程,主要是电子表格,克服了将六七个利益相关者组成的不同团队聚集在一起签署请求的挑战。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Splunk Partnership Ties Together Big Data & IoT Services
Splunk was faced with the need to meet emerging customer demands for interfacing IoT projects to its suite of services. The company required an IoT partner that would be able to easily and quickly integrate with its Splunk Enterprise platform, rather than allocating development resources and time to building out an IoT interface and application platform.
Case Study
Bridge monitoring in Hamburg Port
Kattwyk Bridge is used for both rail and road transport, and it has played an important role in the Port of Hamburg since 1973. However, the increasing pressure from traffic requires a monitoring solution. The goal of the project is to assess in real-time the bridge's status and dynamic responses to traffic and lift processes.
Case Study
Bellas Landscaping
Leading landscaping firm serving central Illinois streamlines operations with Samsara’s real-time fleet tracking solution: • 30+ vehicle fleet includes International Terrastar dump trucks and flatbeds, medium- and light-duty pickups from Ford and Chevrolet. Winter fleet includes of snow plows and salters.
Case Study
Condition Based Monitoring for Industrial Systems
A large construction aggregate plant operates 10 high horsepower Secondary Crusher Drive Motors and associated conveyor belts, producing 600 tons of product per hour. All heavy equipment requires maintenance, but the aggregate producer’s costs were greatly magnified any time that the necessary maintenance was unplanned and unscheduled. The product must be supplied to the customers on a tight time schedule to fulfill contracts, avoid penalties, and prevent the loss of future business. Furthermore, a sudden failure in one of the drive motors would cause rock to pile up in unwanted locations, extending the downtime and increasing the costs.Clearly, preventative maintenance was preferable to unexpected failures. So, twice each year, the company brought in an outside vendor to attach sensors to the motors, do vibration studies, measure bearing temperatures and attempt to assess the health of the motors. But that wasn’t enough. Unexpected breakdowns continued to occur. The aggregate producer decided to upgrade to a Condition Based Monitoring (CBM) sensor system that could continually monitor the motors in real time, apply data analytics to detect changes in motor behavior before they developed into major problems, and alert maintenance staff via email or text, anywhere they happened to be.A wired sensor network would have been cost prohibitive. An aggregate plant has numerous heavy vehicles moving around, so any cabling would have to be protected. But the plant covers 400 acres, and the cable would have to be trenched to numerous locations. Cable wasn’t going to work. The aggregate producer needed a wireless solution.