• >
  • >
  • >
  • >
  • >

实例探究.

添加案例

我们的案例数据库覆盖了全球物联网生态系统中的 22,657 家解决方案供应商。
您可以通过筛选条件进行快速浏览。

Download Excel
筛选条件
  • (8)
    • (5)
    • (3)
    • (1)
  • (7)
    • (4)
    • (3)
    • (1)
  • (6)
    • (3)
    • (2)
    • (1)
  • (3)
    • (2)
    • (1)
  • (2)
    • (2)
    • (1)
  • 查看全部 5 技术
  • (11)
  • (3)
  • (2)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • 查看全部 14 行业
  • (11)
  • (5)
  • (5)
  • (4)
  • (2)
  • (2)
  • (1)
  • 查看全部 7 功能区
  • (10)
  • (7)
  • (4)
  • (4)
  • (3)
  • (2)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • 查看全部 12 用例
  • (9)
  • (3)
  • (3)
  • (3)
  • (1)
  • (1)
  • 查看全部 6 服务
  • (23)
Selected Filters
23 实例探究
排序方式:
Pitney Bowes Industrial Internet - GE Digital (GE) Industrial IoT Case Study
Pitney Bowes 工业互联网
世界上第一个工业互联网平台 Predix 成为 Pitney Bowes 生产邮件业务创收和显着新成本节约的途径。一个普通的邮件业务,这不是。在美国每天生产的 1.5 亿封邮件中,大部分通过 Pitney Bowes 机器。
下载PDF
Marathon Petroleum Develops Collaborative Strategy for Optimizing APM - GE Digital (GE) Industrial IoT Case Study
Marathon Petroleum 制定优化 APM 的协作策略
自 1999 年以来,Marathon 一直在利用 Meridium(现已被 GE Digital 收购)的资产绩效管理 (APM) 来满足其多个业务部门的日常可靠性需求,目前拥有超过 1,300 名 APM 用户。实施 SAP 后,Marathon 发现模块深度定制,难以适应现有的可靠性计划。因此,Marathon 开始研究如何改进其整体运营支持
下载PDF
Petropriar Uses Operator Rounds to Improve Asset Performance and Avoid Unplanned - GE Digital (GE) Industrial IoT Case Study
Petropriar 使用运营商轮次来提高资产性能并避免计划外
Petropriar, SA 是Petróleos de Venezuela SA 的子公司,在该国的奥里诺科带拥有并经营石油和天然气储备。 Petropriar 需要一种简单的方法来管理对其中一个工业园区的旋转电气和静态设备的检查。
下载PDF
Tacoma Power Reduces Cost and Risk with HMI and SCADA Virtualization - GE Digital (GE) Industrial IoT Case Study
Tacoma Power 通过 HMI 和 SCADA 虚拟化降低成本和风险
塔科马电力公司位于华盛顿州塔科马市,为 160,000 名电力公司客户提供服务,在四条河流上拥有九个水电设施。公司的一代自动化团队,由三名工程师和一名工程技术人员组成,负责集成化、现代化。该公司有一小部分员工负责监督许多不同的环境,因此希望在虚拟环境中实施其 HMI/SCADA 系统以实现自动化和控制,以优化运营并降低成本。
下载PDF
Waterford Township Improves Maintenance Consistency and Efficiency - GE Digital (GE) Industrial IoT Case Study
Waterford Township 提高了维护的一致性和效率
Waterford Township 面临着大量 DPW 员工退休的问题,其中一些员工拥有超过 3 年的水和废水知识。该公司开始寻找一种解决方案,该解决方案希望从其 SCADA 系统到其 CMMS 和 DMS 的实时操作数据,以便在定义的工作流程程序中满足条件时自动创建标准操作程序和工作指令。该项目的一个关键方面是使操作程序标准化,并采用一种格式,使可能不熟悉该系统的现场工作人员可以遵循必要的步骤来纠正问题。
下载PDF
Dubai Aerospace Enterprise Enhances Efficiency with GE Digital’s Asset Transfer System - GE Digital (GE) Industrial IoT Case Study
迪拜航空航天企业通过 GE 简化客户体验
该解决方案必须将所有技术记录纳入单一文件管理系统,以支持在出租人和运营商之间传输文件的最新国际监管标准。由于文档跨越多年,DAE 希望以前所未有的方式为用户提供对这些文档的快速、高效访问。
下载PDF
Kahramaa Reduces Grid Equipment Failure by Half - GE Digital (GE) Industrial IoT Case Study
Kahramaa Reduces Grid Equipment Failure by Half
Kahramaa, the sole transmission and distribution system owner and operator for the electricity and water sector in Qatar, had an ambitious business goal. They wanted to identify and prioritize maintenance and asset replacement based on risks related to the current condition of all electrical assets across their distribution substations. The challenge was to find a system that could provide consistent analytics for all assets, recommendations for action based on condition and risk, and provide comprehensive, fleet-wide reporting.
下载PDF
Cornell University Optimizes Energy Efficiency With iFIX From GE Digital - GE Digital (GE) Industrial IoT Case Study
Cornell University Optimizes Energy Efficiency With iFIX From GE Digital
Cornell University, a leading learning institution in Ithaca, New York, maintains 260 major buildings on 745 contiguous acres. The campus consumes up to 35 megawatt (MW) capability to power the buildings. In an effort to conserve electricity and reduce greenhouse gas (GHG) emissions, Cornell sought a visualization and control system to monitor its operations and drive down operational costs. The university needed a system that could monitor and control major aspects of the campus facility operations, including lake source cooling, water filtration, and steam and power generation. The university also wanted to deliver real-time operational intelligence from across these facilities’ systems, enhancing the use of iFIX for campuswide monitoring and control.
下载PDF
Large Investor Owned Utility Manages Renewable Energy on the Grid - GE Digital (GE) Industrial IoT Case Study
Large Investor Owned Utility Manages Renewable Energy on the Grid
A large American utility owner was experiencing a substantial increase in the penetration of distributed generation within three of the southern states that it served. The nature of renewable energy is volatile and during low load periods, feeders with high photovoltaic (PV) penetration could exhibit reverse power flows, potentially causing problems with protection systems. Intermittent solar production could also result in voltage swings, increasing the cycling of regulation equipment at feeders and distribution substations.
下载PDF
Manova Achieves More Profitable Market Position with Flexible Operations - GE Digital (GE) Industrial IoT Case Study
Manova Achieves More Profitable Market Position with Flexible Operations
Mainova AG, one of the largest regional energy suppliers in Germany, was facing a challenge in the competitive landscape of cogeneration using gas fuel. In Germany, electricity sells on a daily basis and purchases are mainly driven by the price of fuel. Other less costly fuel sources, such as solar, wind, coal and nuclear take precedence, leading Mainova to take an innovative step to drive production efficiency. Mainova was interested in lowering its minimum part load, reducing fuel costs, and improving maximum power output — all while maintaining emissions compliance.
下载PDF
Bruce Power Optimizes Availability to Power Ontario at Lower Cost with APM - GE Digital (GE) Industrial IoT Case Study
Bruce Power Optimizes Availability to Power Ontario at Lower Cost with APM
Bruce Power operates the world’s largest nuclear generating facility and provides Ontario, Canada with roughly 30% of its electricity. The company’s site in Tiverton, Ontario is home to eight CANDU reactors — each capable of producing up to 800 megawatts. With the nuclear power industry struggling to balance rapidly increasing demand with the costs and safety measures required to support an aging equipment base, Bruce Power identified scheduled maintenance activities as a source for efficiency gains — enabling increased availability. Specifically, the company had more scheduled maintenance activities than capacity, resulting in delays.
下载PDF
Owensboro Municipal Utilities Improves Efficiency and Reduces Emissions with Digital - GE Digital (GE) Industrial IoT Case Study
Owensboro Municipal Utilities Improves Efficiency and Reduces Emissions with Digital
Owensboro Municipal Utilities (OMU), the largest municipal electric system in Kentucky, was facing a significant challenge concerning plant emissions. The Elmer Smith Power Station, with its two coal-fired boilers, was struggling to service its over 26,000 customer-owners with reliable electricity due to these emission issues. Additionally, OMU needed the flexibility to adapt effectively and economically to the rapidly changing energy landscape. The challenge was to find a solution that could reduce greenhouse gas emissions, improve heat rate, and offer more efficient maintenance options to reduce outages related to issues like tube ruptures.
下载PDF
Google Display Network Mobile Ad Optimization - GE Digital (GE) Industrial IoT Case Study
Google Display Network Mobile Ad Optimization
The client, an enterprise-level B2B company providing financial services and mobile payment solutions, had two main goals for their Google Display Network (GDN) campaigns. The first goal was to drive incremental traffic for new user acquisition. The second goal was to scale the GDN program to grow the client’s user base while maintaining a profit margin of at least 30%. The challenge was to find the right balance between driving traffic and maintaining profitability.
下载PDF
Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories - GE Digital (GE) Industrial IoT Case Study
Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories
RasGas, a Qatari joint stock company owned by Qatar Petroleum and ExxonMobil, is one of the world's premier integrated liquefied natural gas (LNG) enterprises. The company is focused on cost and value optimization to reduce overall expenditures and enhance efficiency by improving plant reliability and availability without compromising safety, health, and the environment. The LNG production at RasGas in Ras Laffan, Qatar, consists of seven LNG production trains with an approximate capacity of 37MM Tons a year. The company began an initiative in late 2014 with a pilot for early detection of equipment or system failures and production optimization for selected units of three LNG trains.
下载PDF
Toray Plastics (America), Inc. Optimizes Manufacturing Operational Performance with Big Data Analytics - GE Digital (GE) Industrial IoT Case Study
Toray Plastics (America), Inc. Optimizes Manufacturing Operational Performance with Big Data Analytics
The diversification of today’s “food-on-demand” culture has led to an increasing need for keeping food products safe and fresh for extended periods of time—all while preserving its original flavor. Consumers expect their food products to maintain a relatively long shelf life without compromising quality. And as a result of this growing demand, Toray Plastics was faced with producing better food packaging film than ever before. Food packaging film is composed of very unique components for protecting against oxygen and water, and producing these films is no easy task. It requires very tight production processes that are examined with the utmost scrutiny to ensure the highest quality. So, in order for Toray Plastics to meet its vision to remove waste across the organization and remain competitive, the company implemented a new integrated system that allowed it to monitor its film manufacturing much more closely to ensure exact quality standards in every unit.
下载PDF
Power On Demand — Fast and Efficient - GE Digital (GE) Industrial IoT Case Study
Power On Demand — Fast and Efficient
Platte River Power Authority, a not-for-profit wholesale electricity generation and transmission provider in Colorado, faced a challenge. The company's 668 MW Rawhide Energy Station consists of a primary coal-fired unit with four GE 7EA gas turbines as peaking and backup units. Additional power sources include coal, hydro, and wind. Platte River required a backup for its primary unit as well as a backup for any other operating sources. Additionally, they wanted a hedge against short-term market pricing fluctuations, while maintaining strict emissions controls.
下载PDF
The City of Haverhill Water and Wastewater Division: Meeting critical needs and maintaining high quality - GE Digital (GE) Industrial IoT Case Study
The City of Haverhill Water and Wastewater Division: Meeting critical needs and maintaining high quality
The city of Haverhill, Massachusetts, operates both Water and Wastewater Divisions, providing drinking water to 58,000 residents and businesses, and producing two billion gallons of water on average each year. The facilities are 32-years-old, however, the control strategies they have in place today have put them well ahead of other facilities of similar size and operation. The Water Division is also responsible for monitoring, water maintenance, and water treatment, which includes protecting water resources. The city of Haverhill is currently supplied with water from Kenoza Lake, Millvale Reservoir, Round Pond, and Crystal Lake. The Wastewater Division maintains the wastewater treatment plant, which provides both primary and secondary treatment for the city’s wastewater. Within the Wastewater Division there are two groups—one monitoring wastewater collection, and the other overseeing wastewater treatment, which includes bringing water and routing wastewater into various facilities from multiple points across the city.
下载PDF
Case Study - Google Display Network (GDN) Performance for The Grommet - GE Digital (GE) Industrial IoT Case Study
Case Study - Google Display Network (GDN) Performance for The Grommet
The Grommet, a product-launch platform, was facing a challenge in increasing membership signups. They were looking for ways to improve their Google Display Network (GDN) creatives using cross-channel findings. The company wanted to leverage the value propositions of The Grommet to provide browsers more reasons to sign up. They developed and highlighted a registration wall to show users that if they signed up, they would get coupons, daily updates on launches, and the ability to earn $10.
下载PDF
Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories - GE Digital (GE) Industrial IoT Case Study
Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories
Salt River Project (SRP) provides generation, transmission and distribution services, as well as metering and billing services to over 1 million customers in the Phoenix metro area. They operate 12 power plants, including coal, nuclear, natural gas and renewable sources (hydroelectric, solar, wind, and geothermal). SRP was looking for a solution that would allow them to integrate data across multiple plants for outage management, to optimize maintenance strategies and to understand where production issues might occur next. They also wanted to identify opportunities to extend monitoring across their transmission and distribution-critical assets. With today’s complex business environment, increased public scrutiny and regulatory oversight, SRP wanted a smarter approach to sustained reliability for the most efficient power production possible. To obtain that level of availability, SRP needed a means to readily analyze the data of their generation assets in a cohesive and consolidated manner.
下载PDF
Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories - GE Digital (GE) Industrial IoT Case Study
Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories
PSEG, one of the 10 largest electric companies in the U.S., was faced with the challenge of providing economic and reliable power as demand and fuel prices fluctuated. The company needed to maintain a profitable business with their existing power generation assets. At the same time, PSEG leadership recognized the value of leveraging data from their plants to make more informed decisions about operations and market opportunities.
下载PDF
Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories - GE Digital (GE) Industrial IoT Case Study
Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories
A2A, the largest Italian multi-utility company, was faced with the challenge of modernizing their Chivasso power plants to become more responsive to changing grid demands and to boost productivity in a competitive market. The company needed to reopen the plant with compelling improvements to efficiency and a lower impact on the environment. Achieving the lowest emissions compliant load level was a critical success factor for A2A to compete successfully in the ancillary services market space, particularly in their location.
下载PDF
Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories - GE Digital (GE) Industrial IoT Case Study
Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories
BC Hydro was faced with integrating data from two million smart meters and 30 network systems. As they began a smart meter roll-out, the leadership quickly recognized that without the right technology, it would face significant challenges integrating and analyzing such a large volume of data from so many different sources.
下载PDF
Panama Minimizes Imbalance Penalties with Power Forecasting - GE Digital (GE) Industrial IoT Case Study
Panama Minimizes Imbalance Penalties with Power Forecasting
Panama Group, a power generation company based in India, was faced with the challenge of meeting India's Renewable Regulatory Fund (RRF) regulatory requirements. The company needed to determine the quality and resolution of weather data for forecast accuracy. However, they were dealing with unreliable site connectivity, which made it difficult to manage turbine data availability and gain closed-loop control. The challenge was to find a solution that could address these issues and help the company meet its regulatory requirements.
下载PDF
  • 1
  • of 1

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 Asia Growth Partners 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 Asia Growth Partners 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。