技术
- 平台即服务 (PaaS) - 应用开发平台
适用功能
- 销售与市场营销
用例
- 需求计划与预测
- 结构健康监测
关于客户
本案例研究中的客户是一家领先的屋顶材料生产商。该公司的需求很大程度上取决于天气状况,尤其是在飓风季节。重大风暴过后,随着人们、公司和政府寻求重建家园和生计,对屋顶材料的需求激增。该公司正在寻找一种方法来更好地了解和预测飓风季节即将到来的需求,以为其制造决策提供信息,包括要生产的屋顶材料的数量和类型。
挑战
一家领先的屋顶材料生产商在了解飓风季节即将到来的需求方面面临着挑战。该公司的需求主要取决于天气,在大风暴过后,随着人们、公司和政府寻求重建家园和生计,对屋顶材料的需求激增。该公司需要更详细的信息来为其制造决策提供信息,包括要生产的屋顶材料的数量和类型。面临的挑战是准确预测 2022 年飓风季节对建筑材料需求的影响,以便根据预期需求制定更好的供应计划。
解决方案
ClimateAi 通过使用 ClimateLens-Monitor 工具发布预测,为屋顶材料公司的挑战提供了解决方案。该工具评估了 2022 年飓风季节对建筑材料需求的影响。 ClimateLens 平台成功预测 9 月份佛罗里达州遭受飓风影响的风险显着升高,远早于飓风伊恩开始活跃。该平台将这种飓风风险转化为对公司有意义的概率见解,例如估计的损失和随后对屋顶产品的需求。这使得该公司能够调整其战术决策,并为佛罗里达州或周边地区飓风登陆的风险增加做好准备。该公司在附近的工厂收集了必要的资源,以便在飓风袭来后增加佛罗里达州专用屋顶瓦的产量。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.

Case Study
Bridge monitoring in Hamburg Port
Kattwyk Bridge is used for both rail and road transport, and it has played an important role in the Port of Hamburg since 1973. However, the increasing pressure from traffic requires a monitoring solution. The goal of the project is to assess in real-time the bridge's status and dynamic responses to traffic and lift processes.

Case Study
Reservoir monitoring in Hontomin
The Spanish Government has launched a CO2 Capture and Storage Program in Hontoman with the aim of developing this technology. This programme's approach is based on the fact that CO2 capture and storage could be an essential part of the solution to achieve substantial global CO2 emission reductions.

Case Study
Parc Des Princes Stadium - Paris Monitoring of the Roof Structure
Advitam has acquired a solid expertise in civil infrastructures monitoring and assets management. During their life cycle, civil engineering structures and construction works are aging, deforming, deteriorating and their mechanical capacities are evolving. A sharp knowledge of the mechanical parameters evolution and the monitoring of physical data are key elements to define and execute predictive maintenance strategies as well as to manage the structure life cycle with balance and to ensure the required safety and security for the users of the civil engineering structure.

Case Study
ASIC DESIGN ON MEDICAL DEVICES
Designed and developed an ASIC for sensing to set up straight with the contact lens. The MEMS sensor which can be digitized through ASIC is reading and transfers the assessments back to the recorder with the same RF link used to power the device using load modulation techniques. By using a 0.35µm process, Faststream could incorporate power capture and conditioning, RF signaling, high linearity ADC, and digital control functionality on a single die within the limited power budget and at a low cost.

Case Study
IoT for Civil Architecture and Artistic Monuments
Some public works, civil and heritage buildings have challenges in detecting abnormal structure movements in real time to maintain control of critical structure points, logging and analyzing data of all the structural properties to identify anomalies and accessing promptly to the data without the need of an on-site intervention.

Case Study
Burlington Bridge
More than 300 trains crossed the Burlington Bridge every month and tons of travel on barges below. It was therefore decided that shutting down rail or river traffic during the construction of a new bridge would only be allowed during a single 30-hour period. With such heavy usage demands, constant river level changes and the inherent complications of working with a 115 year old bridge, monitoring was key to this project. Knowing how and when the bridge moves, vibrates, tilts and bends proved critical for establishing a safe working environment as well as maintaining the bridge’s operational status.