GRAPHISOFT > 实例探究 > Coste Architectures:利用 BIM 取胜 - 圣纳泽尔水上运动中心

Coste Architectures:利用 BIM 取胜 - 圣纳泽尔水上运动中心

GRAPHISOFT Logo
技术
  • 基础设施即服务 (IaaS) - 虚拟私有云
  • 可穿戴设备 - 虚拟现实(VR)眼镜/耳机/控制器
适用行业
  • 建筑物
  • 水泥
适用功能
  • 维护
  • 产品研发
用例
  • 楼宇自动化与控制
  • 结构健康监测
服务
  • 系统集成
关于客户
圣纳泽尔开发商 CARENE 选择了 Coste Architecture 的水上运动中心设计方案。 Coste 的能源和环境提案以及 BIM 的创新使用给他们留下了深刻的印象。
挑战
Coste Architectures 面临着设计圣纳泽尔水上运动中心的挑战,该中心具有复杂的建筑和能源要求,需要与水和能源专家密切合作。
解决方案
Coste Agency 在设计阶段使用 BIM(建筑信息模型),以确保所有利益相关者之间的无缝协调,并最大限度地减少施工过程中的错误风险和额外成本。他们使用 BIM 软件 Archicad 开发建筑的 3D 模型,并使用 IFC(工业基础类)格式与合作伙伴进行沟通。
运营影响
  • The use of BIM in the design phase of the Aquatic Centre in Saint-Nazaire resulted in a seamless coordination between all stakeholders. The 3D model developed in Archicad was used for immersive virtual presentations, internal animations, and easy export of the model for the CGI artist. This not only enhanced the visualization of the project but also improved communication and consultation. The use of BIM also minimized error risks and extra costs during construction. The developer, CARENE, was so convinced by the successful integration of BIM in the early stages of the project that they intend to continue its use for subsequent phases of the project.
数量效益
  • The use of BIM allowed for early detection of problems, reducing the risk of errors and surprises.
  • The use of BIM allowed for decisions to be made from the preliminary design phase, saving valuable time for the future course of the project.
  • The exchange of the digital model created in Archicad worked equally well with Revit MEP, Tekla Structures, AllPlan, and Solibri, demonstrating the flexibility and interoperability of the system.

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。