实例探究 > Stromasys Increases Efficiency for MediSolution Using CHARON-AXP

Stromasys Increases Efficiency for MediSolution Using CHARON-AXP

公司规模
Mid-size Company
地区
  • America
国家
  • Canada
产品
  • CHARON-AXP
  • HP Proliant DL380 G5
技术栈
  • Virtualization Software
  • Microsoft Windows Server
  • Intel Quad-Core Processors
实施规模
  • Enterprise-wide Deployment
影响指标
  • Cost Savings
  • Environmental Impact Reduction
  • Productivity Improvements
技术
  • 平台即服务 (PaaS) - 设备管理平台
适用行业
  • 医疗保健和医院
  • Professional Service
适用功能
  • 商业运营
用例
  • 远程资产管理
服务
  • 系统集成
关于客户
Founded in 1974, MediSolution provides enterprise resource planning and specialized blood bank software solutions and services to healthcare and service sector customers across North America. MediSolution’s Virtuo product portfolio comprises software solutions and services, including the Financial Management Suite (FMS), Human Capital Management Suite (HCM), Business Intelligence Solutions (BI), and Blood Bank Solutions. The company is headquartered in Montreal, Canada, and serves more than 300 healthcare, public, and service-sector organizations. MediSolution is known for maximizing operational efficiencies, lowering costs, and improving service delivery for its clients.
挑战
MediSolution, a leading IT company in Montreal, Canada, faced challenges with their legacy Alpha hardware, which was running out of data storage space and incurring excessive maintenance costs. They needed a system with more storage and lower annual running costs. Migrating applications to a new platform would increase storage capacity but would also take a lot of time and involve considerable expense and risk. Adding another AlphaServer would double capacity but also double maintenance costs, require more space, and increase energy consumption. MediSolution decided to explore other options to avoid recompiling existing applications, a complex and time-consuming task.
解决方案
MediSolution's network administrator, Josue Valdez, sought a solution from Stromasys to address their Alpha hardware dilemma. Stromasys proposed using CHARON-AXP virtualization software, which would allow MediSolution to replace their AlphaServer 1200 hardware with a modern system while continuing to run the existing operating system, applications, and software without modification. MediSolution selected a new HP Proliant DL380 G5 server with two Intel Quad-Core processors, running Microsoft Windows Server. Stromasys scheduled the Charon installation after normal business hours, estimating the process would take approximately two days, including data transfer. The installation was executed swiftly, taking less time than estimated, with minimal effort required from MediSolution.
运营影响
  • MediSolution experienced increased storage capacity and significantly reduced maintenance costs.
  • The new system is twice as fast, has more memory, uses less energy, produces less heat, and occupies less space than the old Alpha system.
  • The installation process was quick and required minimal effort from MediSolution, with Stromasys providing on-site support throughout.
数量效益
  • The new system is two times faster than the old Alpha system.

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 Asia Growth Partners 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 Asia Growth Partners 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。