技术
- 应用基础设施与中间件 - 数据库管理和存储
适用行业
- 设备与机械
用例
- 视觉质量检测
关于客户
美国癌症协会是一家总部位于美国的大型非营利组织,拥有 1,000 至 9,999 名员工。该协会的运营严重依赖志愿者,而志愿者的活动又依赖于该协会的移动应用程序。该组织从事非营利性行业,为抗击癌症提供重要服务。该协会的 IT 团队在支持这些行动方面发挥着关键作用,确保志愿者拥有必要的工具和平台来有效履行其职责。
挑战
美国癌症协会是一家总部位于美国的大型非营利组织,严重依赖其志愿者,而志愿者又依赖该协会的移动应用程序。该组织面临协作、开发速度、流程组织和高数据库成本方面的挑战。 IT 团队需要一种能够简化运营、加速开发流程并显着降低数据库成本的解决方案。现有系统的效率不足以满足这些需求,因此需要采用更强大且更具成本效益的解决方案。
解决方案
为了应对这些挑战,美国癌症协会的 IT 团队决定采用 Microsoft Azure DevOps。此策略涉及开源技术的集成,例如 .NET Core 与 Azure DevOps Services(以前称为 Microsoft Visual Studio Team Services)、Visual Studio Tools for Xamarin、Azure App Service 和 Azure Cosmos DB。这种技术组合提供了一个全面的解决方案,可以促进更轻松的协作、更快的开发、更好的流程组织,并显着降低数据库成本。 Azure DevOps 的采用标志着社会 IT 战略的重大转变,使他们能够利用云计算和开源技术的力量来更有效地推动运营。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.