技术
- 平台即服务 (PaaS) - 应用开发平台
适用行业
- 水泥
- 设备与机械
用例
- 楼宇自动化与控制
关于客户
One Pager Tool 的主要客户是为其业务寻求资金的企业家。这些人经常在筹集资金的过程中遇到困难,特别是在撰写有关他们公司的简洁而引人注目的叙述时。他们在追踪潜在投资者方面还面临挑战。 Tim Cooley 的客户也使用该工具,因为它最初是为内部使用而开发的。该工具已在 timlcooley.com 上向更广泛的公众开放,吸引了正在筹集资金并通过《宣传册:如何展示您的业务并吸引投资者》等资源找到该工具的用户。
挑战
One Pager Tool 的开发是为了解决企业家在筹集资金时面临的挑战。筹集资金的过程通常很复杂,需要一个清晰、简洁的故事来吸引潜在投资者。然而,许多企业家在撰写令人信服的叙述和追踪感兴趣的投资者方面遇到了困难。此外,创始人 Tim Cooley 还指出需要经济实惠的工具来协助这一过程。作为一名企业家本人,他意识到开发此类工具的成本很高,并寻求一种不需要大量财务投资的解决方案。
解决方案
One Pager Tool 建立在 Bubble 无代码平台上,为寻求筹集资金的企业家提供了一种简单且经济高效的解决方案。该应用程序引导用户回答一系列问题,帮助他们编写有关其公司的简洁的一页故事。 One Pager 上线后,可以与潜在投资者共享。该应用程序还要求投资者输入他们的电子邮件地址,使企业家能够跟踪谁对他们的公司感兴趣。使用像 Bubble 这样的无代码平台可以实现经济高效的开发过程,并具有定制选项和资源的额外优势。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.