适用行业
- 汽车
- 石油和天然气
适用功能
- 销售与市场营销
用例
- 时间敏感网络
关于客户
OEConnection (OEC) 是汽车行业领先的技术解决方案提供商。他们专注于为汽车制造商及其特许经销商提供高质量的解决方案,重点是促进原始设备 (OE) 替换零件的销售。 OEC 的服务在汽车行业至关重要,因为它们有助于简化销售原厂更换零件的流程,确保汽车制造商和经销商能够高效、有效地到达其目标市场。然而,与许多企业一样,OEC 在潜在客户开发和参与方面面临挑战,这对其销售和整体业务绩效至关重要。
挑战
OEConnection (OEC) 是一家为汽车制造商及其特许经销商提供高质量技术解决方案的提供商,在潜在客户开发过程中面临着重大挑战。尽管投入了大量的时间和资源来产生潜在客户,但结果充其量也微乎其微。该公司需要更多地关注合格的潜在客户,以最大限度地利用机会,但又不能增加员工人数。这构成了一项重大挑战,因为它需要一种更高效、更有效的方法来产生和参与潜在客户,同时又不会增加成本或需要额外的人员。
解决方案
为了应对这一挑战,OEC 转向 Conversica 的 AI 解决方案。 Conversica 的 AI 助手被部署为持续处理管道中的潜在客户,为每个潜在客户平均发送 12 条消息以实现成功参与。该解决方案使 OEC 能够优化其销售流程,跟踪人工智能平台带来的潜在客户和转化客户的数量。 OEC 的销售团队现在根据产品兴趣使用四种类型的潜在客户参与对话来接触不同的目标受众。这种人工智能驱动的方法不仅简化了潜在客户生成流程,还提高了潜在客户的质量,从而最大限度地提高了转化机会。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Taking Oil and Gas Exploration to the Next Level
DownUnder GeoSolutions (DUG) wanted to increase computing performance by 5 to 10 times to improve seismic processing. The solution must build on current architecture software investments without sacrificing existing software and scale computing without scaling IT infrastructure costs.
Case Study
Remote Wellhead Monitoring
Each wellhead was equipped with various sensors and meters that needed to be monitored and controlled from a central HMI, often miles away from the assets in the field. Redundant solar and wind generators were installed at each wellhead to support the electrical needs of the pumpstations, temperature meters, cameras, and cellular modules. In addition to asset management and remote control capabilities, data logging for remote surveillance and alarm notifications was a key demand from the customer. Terra Ferma’s solution needed to be power efficient, reliable, and capable of supporting high-bandwidth data-feeds. They needed a multi-link cellular connection to a central server that sustained reliable and redundant monitoring and control of flow meters, temperature sensors, power supply, and event-logging; including video and image files. This open-standard network needed to interface with the existing SCADA and proprietary network management software.
Case Study
Refinery Saves Over $700,000 with Smart Wireless
One of the largest petroleum refineries in the world is equipped to refine various types of crude oil and manufacture various grades of fuel from motor gasoline to Aviation Turbine Fuel. Due to wear and tear, eight hydrogen valves in each refinery were leaking, and each cost $1800 per ton of hydrogen vented. The plant also had leakage on nearly 30 flare control hydrocarbon valves. The refinery wanted a continuous, online monitoring system that could catch leaks early, minimize hydrogen and hydrocarbon production losses, and improve safety for maintenance.
Case Study
Integral Plant Maintenance
Mercedes-Benz and his partner GAZ chose Siemens to be its maintenance partner at a new engine plant in Yaroslavl, Russia. The new plant offers a capacity to manufacture diesel engines for the Russian market, for locally produced Sprinter Classic. In addition to engines for the local market, the Yaroslavl plant will also produce spare parts. Mercedes-Benz Russia and his partner needed a service partner in order to ensure the operation of these lines in a maintenance partnership arrangement. The challenges included coordinating the entire maintenance management operation, in particular inspections, corrective and predictive maintenance activities, and the optimizing spare parts management. Siemens developed a customized maintenance solution that includes all electronic and mechanical maintenance activities (Integral Plant Maintenance).