公司规模
Large Corporate
地区
- Asia
国家
- China
产品
- Blue Yonder
技术栈
- Supply Chain Management Software
实施规模
- Enterprise-wide Deployment
影响指标
- Cost Savings
- Productivity Improvements
- Customer Satisfaction
技术
- 功能应用 - 库存管理系统
适用行业
- 设备与机械
适用功能
- 物流运输
- 仓库和库存管理
用例
- 库存管理
- 供应链可见性(SCV)
服务
- 系统集成
关于客户
Positec 是一家家装工具制造商和营销商,主要面向专业承包商和房主。该公司总部位于中国苏州,实现了行业领先的增长。它在 12 个国家/地区拥有近 4,000 名员工。尽管取得了成功,但 Positec 意识到其用于管理全球供应链的内部工具并不代表最先进的创新技术。该公司需要一种综合预测工具和智能履行功能来优化库存水平并有利地部署产品。
挑战
Positec 是一家总部位于中国的家装工具制造商和营销商,在管理其全球供应链方面面临多项挑战。尽管该公司的增长速度领先于行业,业务遍及 12 个国家/地区,但其用于管理供应链的内部工具却达不到标准。Positec 缺乏综合预测工具和智能履行能力,无法优化库存水平并有利地部署产品。该公司的补货计划周期很长,这大大延迟了其响应时间。它也没有在区域配送中心层面进行规划的真正基础,并且其整个全球供应链的可见性很低。
解决方案
Positec 实施了供应链管理软件 Blue Yonder,以自动化和更高效率取代了手动规划和报告流程。该软件使 Positec 能够制定涵盖所有客户、地区和产品线的总体预测。它还允许公司为预测分配美元价值,包括新产品发布和零售促销等复杂事件。该公司现在对其需求预测的信心更高,因为它基于全公司的协作以及数据和分析。Blue Yonder 的实施显著改善了 Positec 的供应链运营。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Data Gathering Solution for Joy Global
Joy Global's existing business processes required customers to work through an unstable legacy system to collect mass volumes of data. With inadequate processes and tools, field level analytics were not sufficient to properly inform business decisions.