适用行业
- 水泥
- 设备与机械
适用功能
- 采购
用例
- 时间敏感网络
关于客户
Beacon Homes 是一家位于加拿大艾伯塔省的定制住宅建筑公司。他们的团队只有两人,每年建造五到七座定制住宅,并负责装修项目。创始人兼所有者考特尼·怀特豪斯 (Courtenay Whitehouse) 负责完成公司的大部分销售。
挑战
与许多忙碌的房屋建筑商一样,Beacon Homes 的创始人兼所有者考特尼·怀特豪斯 (Courtenay Whitehouse) 在跟踪和传达工地决策方面面临着挑战,这导致了额外的成本并侵蚀了项目的底线。他需要一种更好的方法来捕捉当下的成本,并避免事后依赖他的记忆。
解决方案
Courtenay 发现了 CoConstruct 的变更单流程,这使他能够轻松掌握当前成本并快速签署。有了 CoConstruct,他不再需要与客户坐下来查看一系列定价更新,因为客户可以看到他们已批准的所有更改以及由此产生的价格差异。 CoConstruct 还提供了模板,使 Courtenay 能够更轻松地浏览新项目并为其定价,从而节省时间并提高整体运营效率。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.

Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.

Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.

Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.

Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.

Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.

Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.