适用行业
- 金属
用例
- 库存管理
- 现场人员安全管理
关于客户
US Pipe 最初成立于 1899 年,当时名为美国铸铁管和铸造公司,通过收购和扩张,现已发展成为国内最大的球墨铸铁管生产商。该公司以其创新、服务和质量原则而自豪,并提供一系列产品来服务于水和废水处理行业。一个多世纪以来,US Pipe 一直为其客户提供可靠且经济的解决方案。该公司在全国多个地点开展业务,这给管理其运营带来了独特的挑战。
挑战
US Pipe 是国内最大的球墨铸铁管生产商,由于采用人工资本支出申请流程,在运营管理方面面临挑战。该流程繁琐且缓慢,使得该公司难以有效管理其资源和运营。此外,该公司在其工厂的安全事故报告方面也遇到了困难。现有系统效率不高,无法快速、轻松地报告事件。此外,该公司必须管理全国各地的不同地点,这在保持标准化流程的一致性和可扩展性方面提出了独特的挑战。
解决方案
US Pipe 决定于 2013 年 7 月实施工作流程管理解决方案 Integrify。选择该解决方案是因为它能够利用内部资源进行部署和管理。第一步是自动化资本支出申请流程。成功实施后,Integrify 的使用开始扩展到其他部门和职能,包括 IT、人力资源、供应链和安全。为了改进安全事件报告,开发了一个系统,允许任何主管通过填写简短表格通过内部 Intranet 站点报告事件。根据工作流程规则,这些事件被记录并通过电子邮件发送给整个公司的相关经理。 Integrify 还用于标准化和自动化 US Pipe 所有地点的流程,确保一致性和可扩展性。
运营影响
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Goldcorp: Internet of Things Enables the Mine of the Future
Goldcorp is committed to responsible mining practices and maintaining maximum safety for its workers. At the same time, the firm is constantly exploring ways to improve the efficiency of its operations, extend the life of its assets, and control costs. Goldcorp needed technology that can maximize production efficiency by tracking all mining operations, keep employees safe with remote operations and monitoring of hazardous work areas and control production costs through better asset and site management.
Case Study
KSP Steel Decentralized Control Room
While on-site in Pavlodar, Kazakhstan, the DAQRI team of Business Development and Solutions Architecture personnel worked closely with KSP Steel’s production leadership to understand the steel production process, operational challenges, and worker pain points.
Case Study
Bluescope Steel on Path to Digitally Transform Operations and IT
Increasing competition and fluctuations in the construction market prompted BlueScope Steel to look toward digital transformation of its four businesses, including modern core applications and IT infrastructure. BlueScope needed to modernize its infrastructure and adopt new technologies to improve operations and supply chain efficiency while maintaining and updating an aging application portfolio.
Case Study
RobotStudio Case Study: Benteler Automobiltechnik
Benteler has a small pipe business area for which they produce fuel lines and coolant lines made of aluminum for Porsche and other car manufacturers. One of the problems in production was that when Benteler added new products, production had too much downtime.
Case Study
Continuous Casting Machines in a Steel Factory
With a very broad range of applications, steel is an important material and has been developed into the most extensive alloy in the engineering world. Since delivering high quality is absolutely crucial for steel plants, ensuring maximum productivity and the best quality production are the keys to competitiveness in the steel industry. Additionally, working conditions in steel factories are not suitable for workers to stay in for long periods of time, so manufactures usually adopt various machines to complete the steel production processes. However, the precision of these machines is often overestimated and the lack of flexibility also makes supervisors unable to adjust operating procedures. A renowned steel factory in Asia planned to improve its Distributed Control System (DCS) of furnaces as well as addressing the problem of insufficient accuracy. However, most well-known international equipment suppliers can not provide a satisfactory solution and local maintenance because the project needed new technologies to more accurately control equipment operations. By implementing Advantech’s automated monitoring and control solution, steel factories can not only improve the manufacturing processes but can also allow users to add additional functions to the existing system so as to make sure the operation runs at high efficiency.
Case Study
Automated Predicitive Analytics For Steel/Metals Industry
Asset to be monitored: Wire Compactor that produces Steel RebarCustomer Faced The Following Challenges:Dependent upon machine uptime.Pressure cylinders within the compactor fail to control compression and speed causing problems in binding the coil.Equipment failure occurs in the final stage of production causing the entire line to stop, can you say bottleneck?Critical asset unequipped with sensors to produce data.