适用行业
- 设备与机械
- 包装
适用功能
- 产品研发
用例
- 智能包装
服务
- 系统集成
关于客户
Fiskeby 是欧洲领先的包装纸板制造商之一,其历史可以追溯到 1637 年。它是斯堪的纳维亚半岛唯一一家生产由 100% 回收纤维制成的包装纸板的公司。其所有产品(包括 Multiboard)均以环保和可持续的方式制造,旨在为子孙后代保护地球资源。公司总部位于瑞典诺尔雪平。 Fiskeby 的 Dennis Lundqvist 负责项目的控制系统和自动化,他在决定采用 BricsCAD 作为公司首选 CAD 工具的过程中发挥了关键作用。
挑战
Fiskeby 是欧洲领先的包装纸板制造商,正在为其工业过程设备寻找经济实惠且高效的设计工具。该公司致力于环保和可持续制造,需要一种不仅具有成本效益,而且能够与现有系统无缝集成的解决方案。我们面临的挑战是找到一种能够实现平稳过渡、最大限度地减少对公司运营的干扰的工具。该工具还需要可靠、错误最少,并提供出色的支持以确保不间断的操作。
解决方案
Fiskeby 选择 BricsCAD 作为其首选设计工具,是因为它的经济性、许可性以及与瑞典文档工具开发商 Insyde 的集成。经过短暂的调整期后,Fiskeby 团队开始认识到使用 BricsCAD 的优势。事实证明,该工具快速可靠,负责 Fiskeby 项目控制系统和自动化的 Lundqvist 表示,该工具没有任何错误。 BricsCAD 提供的网络许可证在整个公司网络中浮动,提供了灵活性和易用性。该工具还配备了出色的支持知识库,确保任何问题都可以快速解决。展望未来,该公司还在考虑将其他 3D 技术整合到其运营中。
运营影响
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Data Gathering Solution for Joy Global
Joy Global's existing business processes required customers to work through an unstable legacy system to collect mass volumes of data. With inadequate processes and tools, field level analytics were not sufficient to properly inform business decisions.