适用行业
- 设备与机械
用例
- 时间敏感网络
服务
- 系统集成
关于客户
Optiable 是一家总部位于路易斯安那州的公司,专门帮助律师事务所利用技术简化其工作流程。该公司致力于使用与其所协助的业务相一致的特定工具,用更有组织性的结构取代旧的、生产力较低的结构。通过利用最新的生产力工具,Optiable 使从业者能够随时随地工作,专注于他们的专业知识并为客户取得胜利。该组织通常由三到五名全职员工组成的团队运营,具体取决于他们的工作负载需求。
挑战
Optiable 是一家通过技术帮助律师事务所简化工作流程的公司,该公司面临着重大的运营挑战。首席执行官克雷格·拜尔 (Craig Bayer) 花费了大量时间对员工进行微观管理并手动记录流程,这不仅耗时而且效率低下。缺乏系统的运营方法导致团队对其效率缺乏信任。任务没有经过多重验证就无法完成,总担心漏掉什么。这种情况对业务产生了负面影响,因为我们花了很多时间来解决问题,而不是专注于增长和生产力。
解决方案
解决 Optiable 运营挑战的方案是 SweetProcess,这是 Craig Bayer 通过朋友发现的系统。 SweetProcess 提供了一系列吸引拜耳的功能,使他毫不犹豫地注册了。该系统使 Optiable 能够全面记录其业务流程,包括添加图像和视频以帮助理解。它还有助于组织工作流程并提高生产力,减少因混乱而造成的精神疲惫。 SweetProcess 还通过提供充足的工作信息来提高员工效率,减少对拜耳指导的依赖。最后,系统自动执行重复任务,确保日常操作中不会遗漏任何小而重要的任务。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Data Gathering Solution for Joy Global
Joy Global's existing business processes required customers to work through an unstable legacy system to collect mass volumes of data. With inadequate processes and tools, field level analytics were not sufficient to properly inform business decisions.