技术
- 应用基础设施与中间件 - 事件驱动型应用
- 平台即服务 (PaaS) - 应用开发平台
适用行业
- 设备与机械
- 医疗保健和医院
用例
- 需求计划与预测
- 租赁金融自动化
服务
- 培训
关于客户
Froedtert 与威斯康星医学院是医疗保健提供商的合作伙伴,涵盖 9 家医院、2,000 多名医生以及 45 个健康中心和诊所。他们为大约 150 万名门诊患者、55,000 名住院患者和超过 110 万名全科医生就诊提供服务。
挑战
Froedtert 和威斯康星医学院 (F&MCW) 在整个组织内拥有大量数据,但这些数据是使用 SharePoint 和 Excel 电子表格等工具进行孤岛管理。部门之间的数据共享和协作有限,并且对于离散数据指标的含义几乎没有达成一致。企业和临床领导者也缺乏数据所有权。
解决方案
F&MCW 部署了 Collibra 的自适应数据和分析治理解决方案,以创建单一事实来源并改进数据治理。他们开发了一个名为 Data 360° 的数据治理平台,其中包含超过 45 个数据库的元数据、850 多个指标和 3,240 多个视图。 Collibra 商业友好的用户界面和功能使用户可以轻松搜索和使用该平台。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.

Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.

Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.

Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.

Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.

Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.

Case Study
Data Gathering Solution for Joy Global
Joy Global's existing business processes required customers to work through an unstable legacy system to collect mass volumes of data. With inadequate processes and tools, field level analytics were not sufficient to properly inform business decisions.