技术
- 平台即服务 (PaaS) - 应用开发平台
适用行业
- 水泥
- 设备与机械
适用功能
- 产品研发
用例
- 库存管理
- 时间敏感网络
服务
- 系统集成
关于客户
Vipii 专为各个行业的场馆经理设计,包括健身房、餐厅和沙龙。这些企业经常面临管理客户队列的挑战,同时遵守社交距离准则。此外,他们还需要跟踪客户访问情况以进行接触者追踪。 Vipii 通过提供智能系统来解决这些挑战,该系统允许企业远程排队和联系跟踪客户。该应用程序完全可扩展,适合各种规模的企业。
挑战
COVID-19 大流行给企业带来了一系列新的挑战,特别是餐馆、健身房和沙龙等服务行业的企业。这些挑战之一是在遵守社交距离准则的同时管理客户队列。此外,企业还需要跟踪客户的访问情况,以进行接触者追踪。这可能是一项艰巨的任务,尤其是对于每天接待大量客户的企业而言。 Vipii 由 IT 顾问 Tracy Smith 创立,旨在应对这些挑战。该应用程序旨在提供一个智能系统,允许企业远程排队和联系跟踪客户。
解决方案
Vipii 是一个候补名单管理平台,使企业能够远程排队客户。它提供自动和手动控制选项。通过自动控制,该应用程序会自动计算场地的等待时间,并在距离起床还有五分钟时自动向顾客发送短信。另一方面,手动控制允许企业定义客户的等待时间并从其签到仪表板手动触发短信。该应用程序还允许企业轻松地向客户提供有关指定日期和时间范围内潜在暴露的接触追踪通知。 Vipii 是使用 Bubble 的无代码平台构建的,可以实现平台的快速开发和迭代。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.